Laserfiche WebLink
s - <br /> OAT,�ys'ems 4191-�Power Inn Road. Sacr mento,CA 95826 19161 452.2901 <br /> �o FREMONT a IRVINE • HOUSTON o BOSTON <br /> o SACRAMENTO Y CULVER CITY •SAN]OSE <br /> STI'E ENVIRONMENTAL TY PLAN Nc. 3 NVESTIGATION <br /> SUBSURFACEat the <br /> ARCO Service Station No.2130 <br /> 7609 North El Dorado <br /> Stockton, California <br /> (May 1. 1991) <br /> INT;ZODUC'TION 1 <br /> Plan describes basic safety requirements for the subsurface environ-menta! <br /> This Site Safety l to the employees of Applied <br /> investigation The provisions set forth in this Plan apply <br /> GeoSystems and its subcontractors working on this phase <br /> u the ade dor t increase the subcontractors safety <br /> may elect to modify these provisions, but only lied GeoSystems, as designated and <br /> urrence of App <br /> ;,quirements, and only with the conc <br /> accepted in writing. <br /> ountered <br /> This Site Safety Plan will address the expected potential hazards that may to begin on appenc <br /> roval oval of work <br /> on the worksite for his P�OleCt Envirorunenta!Health D activities are vsian w th the dural on estimated <br /> plan by the San Joaquin County if es in site or working conditions <br /> to be approximately 1 e°g taddendh after a to this plane start te.will be provided by Applied GeoSystems. <br /> occur as activities progr <br /> AUTHORM FOR SITE SAFETY <br /> The Applied GeaSystems personnel responsible for project safety are the Project Manager <br /> e Health an <br /> and the Staff Geologist or Engineer• th and Safety PS gram anddinator may choose responsibleis o audit he <br /> the overall Applied GeoSystems Heal <br /> site for compliance and take appropriate action to correct deficiencies. The Project <br /> iding a copy <br /> Manager is responsible for implementing he provisions of this Planeol #vGeo Geologist or <br /> of this plan to the Staff Geologist or matters. a rpr°jectand °ManagerSand Staff Geologist or <br /> Engineer on health and safety of this <br /> Engineer have the authority to audit site <br /> kapractices tivities for compliance with the or dismiss bcontracto pro conduct <br /> Plan. They may suspend or modify <br /> does not meet he requirements specified in this Plan. <br /> The Staff Geologist or Engineer is responsible for communicating the information contained <br /> Th s#ems ersonnel assigned to the projeci -knd to the . <br /> ---- — --- -- - - ----in-this-Plan-to__he_Applied GeaSy p for-Applied._GeoSystems on the <br /> responsible representative of each subcontractor working <br /> project. <br />