Laserfiche WebLink
- <br /> � k <br /> !- a <br /> 11_20 <br /> r1 <br /> May 1, 1991 <br /> Site Safety Plan <br /> AGS 30003-IS <br /> ARCO Station No.2130, Stockton, California <br /> f Geologist or Engineer will also act as the Site Safety Officer. As such, the Staff <br /> The Stat Bl the following items: <br /> Geologist or Engineer is responsible for addressing <br /> o Implementing the Site Safety Plan. Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> o ings and advising workers regarding hazards <br /> Conducting daily safety meet <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> to suspend time he or she finds <br /> The Staff Geologist or Engineer►las.he authority end work The Staff Geologist or <br /> that the provisions of the Plan are inadequate for workeand Safety r safety- <br /> that <br /> afety Coordinator promptly <br /> Engineer will inform the Project <br /> Manage ideals or and the r alxontraciors whose conduct is not <br /> of deficiencies with:" the <br /> r� consistent with the requirements of this Plan. <br /> MEDICAL SURVEWILANCE <br /> ed in project activities must <br /> Applied GeoSystems personnel and subcontractors engand agbe ed the examining <br /> participate in a medical surveiilanccflon devices and protective clothing for working with <br /> p to wear respiratory prote <br /> physician(s) applicable require of Title 8.Section 521b.of the a ifo .a <br /> hazardous materials. The app applicable <br /> requirements under 29 CFR 1910.120 <br /> AdMWW*at've de will be observed. The app <br /> of the T PdP'al dm'nisirative Code will also be observed. <br /> SAFETY AND ORWWA'ITON MEETIN <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a prof <br /> ect- <br /> training meeting for safety issues and review the project tasks before beginning <br /> specific S ager or Staff Geologist or Eng <br /> work. The meeting will be led by the Project Man of the safety <br /> addition, fit-testing of respiratory prolective devices will ei conducted as 1 art <br /> orientation meeting when the use of a respirator <br /> App/r`�d Ge®SWtems <br />