My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0012685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:36:23 PM
Creation date
8/1/2019 10:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012685
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:a <br /> 3 <br /> t <br /> t_ <br /> i <br /> f <br /> A RFSNA Company <br /> r <br /> Fnrirnrem�ntal.iolutinns <br /> a 164 Gold Camp Drive,Suite?00 Through Applied Science, <br /> Ranc:lw Cordova,CA 9-1070 Fngraeering h Construction <br /> Phone(916)852-6690 <br /> FAX(916)852.068$ <br /> SUBSURFACE INVESTIGATION <br /> INTERIM SOIL REMEDIATION WORK PLAN <br /> at <br /> ARCO Service Station No. 2130 <br /> ® 7906 North El Dorado Street <br /> Stockton, California <br /> For ARCO Products Company <br /> INTRODUCTION <br /> 1 , At the request of ARCO Products Company (ARCO), RESNA Industries (RESNA, <br /> formerly Applied GeoSystems) is submitting this subsurface investigation and interim work <br /> plan for soil remediation and replacement of underground storage tanks at ARCO Service <br /> Station No.2130,7906 North EI Dorado Street,Stockton,California. The tank replacement <br /> is planned in conjunction with ARCO's facility upgrade and is not in _response to a known <br /> spill or leak at the site. We are submitting this work plan prior to tank replacement to <br /> obtain authorization from the San Joaquin County Public Health Services, Environmental <br /> r Health Division (SJCPHS-EHD), to install subgrade components during the tank removal <br /> for use in a future vapor-extraction system (VES). The required documents will be <br /> submitted to the SJCPHS-EHD before proceeding with remediation. <br /> This document discusses (1) the results from the Jane 1991 and December 1991 drilling <br /> events, (2) the vapor-extraction feasibility test and (3) describes our field methods for the <br /> upcoming tank replacement project, and the installation of a interim vapor-extraction <br /> M3-4W <br />
The URL can be used to link to this page
Your browser does not support the video tag.