My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009917
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:46:38 PM
Creation date
8/1/2019 10:26:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009917
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY SITE ENVIRONMENTALACTIVITIES <br /> ARCO Facility No.2134 <br /> Date Activity By <br /> 8/5/93 Preconstructnon meeting ARCO,Resna,Roux, <br /> TRI <br /> 8/16/93 Began work on tank removal. Installed fence around Site TRI <br /> ' 8/17/93 Installed shoring along north side of new tank cavity TRI <br /> ' 8/18/93 Cut and removed asphalt and concrete above existing tanks TRI <br /> 8/19/93 Excavated and stockpiled backfill material overlying existing tanks TRI,Roux <br /> Removed and inspected existing USTs TRI,Roux,FHS-EHD <br /> ' Loaded existing USTs onto trucks and hauled from Site TRI,STL <br /> 8/20/93 Collected soil samples from below the removed tanks Roux <br /> ' Excavated and stockpiled soil from within the limits of the new tank cavity. TRI,Roux <br /> Collected samples from the soil stockpiles Roux <br /> ' 8/23/93 Excavated and stockpiled soil from vnthin the limits of the new tank cavity TRI,Roux <br /> Collected samples from the soil stockpiles Roux <br /> 8/24/93 Submitted application for authorization to aerate soil to the APCD Roux <br /> 8/26/93 Installed new USTs and conductor casings TRI,Roux <br /> ' 9/1/93 Re-positioned new USTs TRI,Roux <br /> Received authorization to aerate soil from the APCD. Roux <br /> ' 9/9/93 Collected soil samples from the product Line trenches TRI,Roux <br /> Collected samples from the soil stockpiles Roux <br /> ' 9/10/93 Hauled soil stockpiles to BFI Dillard <br /> 9/14/93 Began aeration of the soil stockpiles Dillard <br /> ' 9/15/93 Continued aeration of the soil stockpiles Dillard <br /> FOOTNOTES <br /> ARCO ARCO Products Company <br /> ' APCD San Joaquin Valley Umfied Air Pollution Control District <br /> Dillard Dillard Trucking, Inc. <br /> Erickson Erickson Inc. <br /> Resna Resna Industries Inc <br /> Roux Roux Associates <br /> PHS-EHD San Joaquin County Public Health Servies, Environmental Health Division - <br /> STL Service Transport Lines <br /> TRI Triangle Inc of Sacramento <br /> ' 1of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.