My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009917
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:46:38 PM
Creation date
8/1/2019 10:26:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009917
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY SITE ENVIRONMENTAL ACTIVITIES <br /> ARCO Facility No.2134 <br /> Date Activity By <br /> ' 9/16/93 Aeration temporarily on hold due to limited space Dillard <br /> Collected samples from the aerated soil stockpiles Roux <br /> 9/23/93 Hauled aerated soil stockpiles to BFI Dillard <br /> 9/24/93 Continued aeration of the soil stockpiles Dillard <br />' 9/27/93 Continued aeration of the sod stockpiles Dillard <br />' 9/28/93 Continued aeration of the soil stockpiles Dillard <br /> 9/29/93 Collected samples from the aerated soil stockpiles Roux <br />' 10/5/93 Hauled aerated soil stockpiles to BFI Dillard <br /> 10/6/93 Continued aeration of the soil stockpiles Dillard <br />' 10/7/93 Continued aeration of the soil stockpiles Dillard <br /> Collected samples from the aerated soil stockpiles Roux <br /> Saw-cut for remediation trenches east of building TRI <br /> 10/$/93 Continued aeration of the soil stockpiles Dillard <br />' 10/11/93 Continued aeration of the soil stockpiles Dillard <br /> Excavated remediation trenches east of building TRI <br />' 10/12/93 Continued aeration of the soil stockpiles Dillard <br /> 10/13/93 Hauled aerated soil stockpiles to BFI. Dillard <br />' Collected samples from the aerated soil stockpiles Roux <br /> 10/14/93 Continued aeration of the soil stockpiles Dillard <br />' 10/15/93 Continued aeration of the soil stockpiles Dillard <br /> Collected samples from the aerated soil stockpiles Roux <br /> FOOTNOTES <br /> ARCO ARCO Products Company <br />' APCD San Joaquin Valley Unified Air Pollution Control District <br /> Dillard Dillard Trucking, Inc <br /> Erickson Erickson Inc. <br /> Resna Resna Industries Inc <br /> Roux Roux Associates <br /> PHS-EHD San Joaquin County Public Health Servies, Environmental Health Division <br /> STL Service Transport Lines <br /> TRI Triangle Inc of Sacramento <br />' 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.