Laserfiche WebLink
DAILY SITE ENVIRONMENTAL ACTIVITIES <br /> ARCO Facility No.2130 <br /> Date Active B <br /> ' 11/9/93 Continued installation of remediation piping and vault boxes. TRI <br /> 11/10/93 Set vault boxes and poured concrete TRI <br /> ' 11/11/93 Backfilled remediation piping trenches TRI <br /> ' 11/12/93 Backfilled remediation piping trenches and poured concrete TRI <br /> 11/15/93 Hauled aerated soil stockpiles to BFI Dillard <br /> ' 11/16/93 Set conductor casing vaults TRI <br /> 11/17/93 Set remediation vault boxes TRI <br /> ' 11/23/93 Set remediation vault boxes and poured and finished concrete TRI <br /> ' 11/24/93 Set remediation vault boxes and poured and fuushed concrete TRI <br /> 11/29/93 Set remediation vault boxes and poured and finished concrete TRI <br /> 12/4/93 Reopened facility for food and gasoline sales ARCO <br /> 1 <br /> 1 <br /> 1 <br /> FOOTNOTES <br /> ARCO ARCO Products Company <br /> APCD San Joaquin Valley Unified Air Pollution Control District <br /> Dillard Dillard Trucking, Inc <br /> Erickson Erickson Inc <br /> Resna Resna Industries Inc. <br /> Roux Roux Associates <br /> PHS-EHD San Joaquin County Public Health Servies, Environmental Health Division <br /> STL Service Transport Lines <br /> TRI Triangle Inc of Sacramento <br /> ' 4of4 <br />