My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009917
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:46:38 PM
Creation date
8/1/2019 10:26:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009917
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> DAILY SITE ENVIRONMENTAL ACTIVITIES <br /> ARCO Facility No.2130 <br /> Date Activity By <br /> ' 10/18/93 Saw-cut and trenched for remechatnon trenches. TRI <br /> 10/19/93 Saw-cut and trenched for remediation trenches TRI <br /> ' 10/20/93 Hauled aerated soil stockpiles to BFI Dillard <br /> Saw-cut and trenched for remediation trenches TRI <br /> ' 10/21/93 Hauled aerated soil stockpiles to BFI Dillard <br /> Saw-cut and trenched for remediation trenches TRI, Roux,Resna <br /> ' 10/22/93 Saw-cut and trenched for remediation trenches TRI <br /> 10/25/93 Saw-cut and trenched for remechation trenches TRI <br /> ' 10/26/93 Began Installation of remediation piping TRI <br /> ' 10/27/93 Continued installation of remediation piping TRI <br /> 10/28/93 Continued installation of remediation piping. TRI <br /> 10/29/93 Continued installation of remediation piping TRI <br /> 11/1/93 Continued installation of remediation piping and pressure tested piping TRI, Resna <br /> 11/2/93 Continued installation of remediation piping, TRI <br />' 11/3/93 Continued installation of remediation piping TRI <br /> 11/4/93 Continued installation of remediation piping TRI <br />' Collected samples from the soil stockpiles Roux <br /> 11/5/93 Continued installation of remediation piping and pressure tested piping TRI, Resna <br />' 11/8/93 Continued installation of remediation piping TRI <br />' F TN <br /> 00 OTES <br /> ARCO ARCO Products Company <br />' APCD San Joaquin Valley Unified Air Pollution Control District <br /> Dillard Dillard Trucking, Inc. <br /> Erickson Erickson Inc <br /> Resna Resna Industries Inc <br /> Roux Roux Associates <br /> PHS-EHD San Joagwa County Public Health Servies, Environmental Health Division <br /> STL Service Transport Lines <br /> TRI Triangle Inc of Sacramento <br />' 3of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.