Laserfiche WebLink
18 September 2001 <br /> AGE-NC Project No.01-0872 <br /> Page 4 of 7 <br /> 5.0. ON-SITE WORK PLANS <br /> Work party(ics) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Brian W. Millman Preserve water samples; direct probing <br /> FIELD CREW: TASK: <br /> Driller Operator Advance borings <br /> Driller Helper Clean equipment <br /> The works party(ies)were briefed on the content of this plan at the site on <br /> 5.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> iwlR . <br /> # @that <br /> �r <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> 7.0. EMERGENCY MEDICAL CARE <br /> San Joaquin General Hospital located at 500 West Hospital Road,Stockton;CA,is approximately <br /> r 5 minutes from the site. A map depicting the route to this facility is attached. <br /> Local ambulance service is available at phone 911. Their response time is 3 to 5 minutes. <br /> First-aid equipment is available onsite at the locations: <br /> First-aid kit: Site safety officer's truck/vehicle <br /> Advanced GeoEnvironmental,Inc. <br />