Laserfiche WebLink
ATC SrrE SAFETY PLAN <br /> i <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all ATC worksites. Level D includes: <br /> Steel toed boots <br /> Safety Glasses <br /> Hard Hat <br /> For each.task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each;task. <br /> f <br /> Task(s� <br /> Condition Personnel Gament(s} j <br /> Working Near Vehicle Orange Vests <br /> 1 >20 ppm for 5 minutes 1/2 Face Respirator <br /> 1 >200 ppm for 5 minutes Evacuate Site � Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all ATC hazardous waste sites. <br /> Site will be secured as follows: Fencing will be usetl when possible. <br /> i <br /> Work Zones will be marked as follows: Orange cones or balrricades and caution tape will be <br /> used to mark off work zone where traffic is present. <br /> MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br /> h <br /> E <br /> PAGE 10 <br /> I <br /> I <br />