My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:56:53 PM
Creation date
8/1/2019 1:22:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> ATC, <br /> srrE SAFETY ri.Aiv <br /> i <br /> On-site communications: 0 Radio ®Verbal 0 Hand Signals <br /> 0 Other <br /> Designate hand signals here: � 1 <br /> Off-site communications: 0 Radio ®Telephone <br /> ik <br /> 0 Other <br /> The specific signal for an emergency is: Verbally Given I <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP OCHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment <br /> (i.e., gloves, coveralls) will be placed in a 55-gallon <br /> drum with soil cuttings <br /> 1 <br /> Location of Wash Water: Restroom on-site <br /> Location of Toilet: Restroom on-site <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP a CHECK WHEN <br /> DONE P <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> k <br /> i <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored M <br /> on-site until appropriate disposal methods <br /> are determined.i <br /> � I <br /> PAGE 11 <br /> L J <br />
The URL can be used to link to this page
Your browser does not support the video tag.