My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:56:53 PM
Creation date
8/1/2019 1:22:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1620 <br /> ve Court <br /> of I HICIMIL If R ' ,'f i'-' Sacram ntotl CA 95864 <br /> ENGINEERING AND ENVIRONMENTAL SERVICES �� O3r 3'? P,° �2; 2� el 485-7222 <br /> Telephone: 916)485-8098 <br /> 29 October 1997 <br /> Ms. Margaret Lagorio <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Street <br /> Stockton, California 95202 <br /> Subject: Addendum to Work Plan for Investigation of Storm Drain Inlets <br /> Stockton Unified School District <br /> Maintenance and Transportation Center <br /> HLI 00816 <br /> Dear Ms. Lagorio: <br /> We previously submitted an application for a permit to drill soil borings at the Stockton Unified <br /> School District's Maintenance and Transportation Center. A work plan for the proposed <br /> investigation accompanied our 24 October 1997 application submittal. We are amending the <br /> number of samples indicated in the work plan that will be analyzed from each boring. Given the <br /> shallow depths of the soil borings(5 to 10 feet),we are proposing to analyze only one sample from <br /> each soil boring, unless field screening indicates that deeper borings are warranted and additional <br /> samples are appropriate. <br /> We have arranged for the drilling to occur on November e and 5d, assuming that the County can <br /> issue permits by that date. Please let us know as,soon as possible if this schedule is not feasible. <br /> Sincerely yours, <br /> HELMICK& LERNER INC. <br /> xz�t/ ICS <br /> Noel M. Lerner <br /> Project Manager <br /> cc: Roy Knight-Stockton Unified School District <br /> Z:\P\00816\WP Adendum.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.