My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELKHORN
>
1050
>
2900 - Site Mitigation Program
>
PR0505234
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 3:05:12 PM
Creation date
8/1/2019 2:13:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505234
PE
2951
FACILITY_ID
FA0001103
FACILITY_NAME
Elkhorn Golf Club
STREET_NUMBER
1050
STREET_NAME
ELKHORN
STREET_TYPE
DR
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
1050 ELKHORN DR
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology Page 2 <br /> 1050 Elkhorn, Stockton <br /> 1/19/96 Date of work plan addendum proposing installation of two dual soil <br /> vapor extraction /air sparge wells and conducting a feasibility test <br /> for air sparging and vapor extraction. <br /> 1/26/96 VW/IAS-1 and VW/IAS-2 installed. <br /> 6/27/96 Date of Quarterly Report and Corrective Action Plan that includes <br /> installation of VW 1 and VW2 which are dual completed vapor <br /> extraction/air sparge wells. Air sparge wells screen slot is from 45 <br /> to 50 feet. VW 1 screen is 15 to 35 feet and VW2 screen is from 20 <br /> to 35 feet. Report recommends soil vapor extraction and air <br /> sparging. <br /> 8/17/96 EHD letter requesting a work plan with remediation system details. <br /> 8/21/96 SWRCB Cleanup Fund letter that risk analysis should be <br /> performed prior to soil vapor extraction remediation. <br /> 11/5/96 EHD review of groundwater sample results and decision to observe <br /> contaminant trends before deciding on further remedial action <br /> required. <br /> 7/31/97 EHD verbally requested Remedial Action work plan since <br /> monitoring well 2 groundwater sample results showed higher <br /> contaminant concentrations. <br /> 8/11/97 Date of Remedial Action Work Plan. <br /> 10/13/97 EHD verbally requested more details on work proposed in 8/11/97 <br /> work plan. <br /> 10/14/97 Dated of Remedial Action Work Plan Addendum. <br /> 10/16/97 EHD letter recommending proceeding with installation of vapor <br /> extraction/air sparge system. <br /> 7/30-31/98 3 vapor extraction and 3 air sparge wells installed. <br /> 10/30/98 Date of Report of Quarterly Monitoring that includes information on <br /> July 1998 work. VW3 and VW4 screen from 25 to 35 feet. VW5 <br /> was an angle boring in the former UST area with screen from 15 to <br /> 35 feet. IAS 3, IAS4, and IAS5 screen from 39 to 44 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.