My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELKHORN
>
1050
>
2900 - Site Mitigation Program
>
PR0505234
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 3:05:12 PM
Creation date
8/1/2019 2:13:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505234
PE
2951
FACILITY_ID
FA0001103
FACILITY_NAME
Elkhorn Golf Club
STREET_NUMBER
1050
STREET_NAME
ELKHORN
STREET_TYPE
DR
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
1050 ELKHORN DR
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Chronology Page 3 <br /> 1050 Elkhorn, Stockton <br /> 7/22/99 Letter from consultant requesting delay in startup of soil vapor <br /> extraction/air sparge system until an internal combustion unit is <br /> available the end of August 1999. <br /> 7/27/99 EHD letter requiring start up of system by 9/1/99. <br /> 9/2/99 Start up of soil vapor extraction/air sparge system. <br /> 2/4/00 Date of Quarterly Report - December 1999 that discusses start up <br /> of soil vapor extraction/air sparge system. States that from 9/99 to <br /> 1/00 78.5 gallons of gas were removed. <br /> 7/26/00 Date of Quarterly Report that recommends modifying system to <br /> blower only since contaminant concentrations have declined to ' <br /> level that doesn't require destruction according to APCD permit. <br /> States that from 1/00 to 6/00 15 gallons of gas were removed. <br /> h <br /> 8/21/00 Consultant letter proposing 3 more months of soil vapor extraction <br /> using blower and confirmation boring work proposed in 8/11/97 f <br /> Remedial Action Work Plan. <br /> 10/13/00 Confirmation boring CB1 and CB2 drilled to 35 feet deep. <br /> 12/6/00 Date of Quarterly Report which includes soil results from CB1 and <br /> CB2 investigation. Reports that from 9/14/00 to 10/20/00 25 <br /> gallons of gas were removed. <br /> 2/23/01 Date of Closure Summary Report. Report states that from <br /> 11/27/00 to 1/23/01 15 gallons of gas were removed. Results of <br /> sampling six monitoring wells on 1/19/01 are in the report. <br /> h <br /> 4/24/01 EHD verbally requested additional sampling of monitoring wells, <br /> some vapor and air sparge wells, vapor sample, and additional <br /> mass balance calculation. <br /> 5/25/01 Date of Quarterly Report with additional information requested on <br /> 4/24/01 by EHD and Well Survey Report. f <br /> 6/26/01 Revised tables of soil and groundwater information submitted. <br /> f� <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.