Laserfiche WebLink
Dwight Davis <br /> Page 2 <br /> 4. The stockpiled soil that was recently sampled which was soil removed <br /> during the tank removal is no longer regulated by PHS/EHD. <br /> 5. Prior to soil remediation of any type, prior approval is required from <br /> PHS/EHD. A workplan shall be submitted to this office consisting of a <br /> detailed description of the remediation plan. <br /> Please contact this office with a 48 hour notice prior to beginning <br /> any activities at this site. <br /> If there are any questions please contact Michael Collins, REHS, at 209-468- <br /> 0338. <br /> Jogi Khanna, M.D., M.P.H. <br /> Health Officer <br /> f <br /> P <br /> Donna Heran, REHS, Program Manager <br /> Environmental Health Division h <br /> DH/MC <br /> c: SWRCB, Underground Storage Tank Section <br /> c: RWQCB, Central Valley Regional <br /> c: Pegasus Group <br /> i <br /> i <br /> p <br /> I <br />