Laserfiche WebLink
... <br /> 23 March 2005 <br /> AGE-NC Project No. 97-0360 <br /> Page 3 of 4 <br /> :-- collected and analyzed this quarter. The analytical results of ground water samples are summarized <br /> in Table 2. The laboratory report (CTEL Project No. CT214-0410077), quality assurance/quality <br /> control (QA/QC) report, and chain of custody form are included in Appendix C. Documents <br /> confirming the upload of laboratory electronic deliverable format (EDF) files and depth to water <br /> -', measurements to GeoTracker are included in Appendix D. <br /> `--' 4.0. SUMMARY AND CONCLUSIONS <br /> Based on data collected from the site this quarter, AGE concludes: <br /> ; <br /> • Ground water flow direction at the site on 13 October 2004 was inferred to be flowing in a <br /> trough, generally toward the southOff a gradient of approximately 0.002 ft/ft. The gradient <br /> +- this quarter is similar to those measured in previous quarters but the flow direction is <br /> inconsistent with previous monitoring events.However,the gradient is so shallow that slight <br /> variations in ground water elevation can cause significant changes in the ground water flow <br /> - direction. <br /> • TPH-g and TPH-d concentrations in well EW-1 remain non-detect this quarter. No other <br /> hydrocarbon compounds or fuel oxygenates were detected in well EW-1 this quarter,or have <br /> been since ground water monitoring began.(Table 2). <br /> (= No analytes were detected at or above laboratory reporting limits in the groundwater samples <br /> collected from wells MW-1 through MW-5 this quarter. <br /> The lateral extent of petroleum hydrocarbon-impacted ground water has been defined to the <br /> north by well MW-4,to the south by well MW-5, and to the west by well MW-3. <br /> 5.0. RECOMMENDATIONS <br /> Based on the findings of the environmental activities recounted in this report, AGE recommends: <br /> • Continuation of quarterly monitoring events as directed by the San Joaquin County <br /> Environmental Health Department(SJCEHD)by letter dated 22 June 2004;the first quarter <br /> monitoring event for 2005 took place on 10 February 2005. <br /> • Preparation of a work plan as required by.the SJCEHD in the letter of response to the AGE- <br /> prepared Closure Summary Report, dated 27 January 2004. The work plan is required to <br /> delineate vertical and lateral soil contamination southwest,east and south of the former UST. <br /> Ground water is required to be delineated east of the former UST. <br /> J <br /> __. Advanced GcoEnvironmental,Inc. <br />