My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2016 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 2016 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 3:32:32 PM
Creation date
8/2/2019 2:31:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2016 TANK TOP UPGRADE
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />OCT 2 7 2016 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />IMPORTANT! Wire used for this installation must have a temperature rating of at least 90°C. be either 14 or 16 AWG, <br />and be color coded. Splicing alarm power with TLS Console power will cause improper operation of the monitor. <br />Wiring Overfill Alarm with Acknowledgement Switch <br />1. Pull two wires from the switch to the Overfill Alarm. <br />2. Pull two wires for line and neutral from the switch to the power panel. <br />3. Pull one wire from the switch to the TLS Console for connection to the alarm relay. <br />4. Pull one wire for line from the alarm relay in the TLS Console to the power panel. <br />5. Turn power Off and connect wiring according to the wiring diagram in Figure 3 and Table 1. <br />Figure 3. Overfill Alarm/Acknowledgement Switch wiring connections <br />5 <br />® N <br />Overfill Alarm <br />(cover open) <br />Horn Time <br />Delay Relay <br />------------------------- <br />Ack Switch <br />i (cover open)t- <br />I <br />-. <br />To Console Relay - <br />Connection See Console <br />® M <br />Table in this manual <br />® N <br />® T <br />Customersupplied �'- __ _____ <br />junctionbox <br />--------- --------------------------------- <br />console\—kwir.eps <br />nl L' <br />--------------------------- <br />To power panel <br />Figure 3. Overfill Alarm/Acknowledgement Switch wiring connections <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.