My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2015 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2015 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 2:07:11 PM
Creation date
8/5/2019 10:44:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2016
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1399\PR0231435\2016 RETROFIT PLANS SR0074936 .PDF
QuestysFileName
2016 RETROFIT PLANS SR0074936
QuestysRecordDate
5/22/2017 9:16:03 PM
QuestysRecordID
3392977
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 of 2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer Industry Standard Professional Engineer <br /> F Other(Specify) <br /> Test Method Used By: W Pressure r Vacuum r Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: Gauge Equipment Resolution: .20 <br /> Vent Pipe for Sup fill <br /> to Vent box <br /> Piping Material: DW fiber <br /> Piping Manufacturer: Smitth <br /> Piping Diameter: 3 in. in. n. in. <br /> Length of Piping Run: 30 ft. ft. I't. ft. <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: Fill sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min min min min <br /> starting test: <br /> Test Start Time: 13:30:00 <br /> Initial Reading(Rt): 5.00000 PSI <br /> Test End Time: 14:30:00 <br /> Final Reading(RF): 5.00000 PSI <br /> Test Duration: 1 hr <br /> Change in Reading(RF-Rt): 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/- +/- <br /> Criteria: <br /> Test Result: Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> rn C 1 � <br /> F1 <br /> �A! 1 1 W7 <br /> HEAL <br /> WO:2330376 <br />
The URL can be used to link to this page
Your browser does not support the video tag.