Laserfiche WebLink
SWRCB,January 2002 Page 1 of 1 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed 13�: r Tank Manufacturer 5_0 Industry Standard F Professional Engineer <br /> F Other(Specify) <br /> Test Method Used By: r Pressure F Vacuum W Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br /> STP Containment for STP Containment for Vent Sump <br /> Tank T4 RUL-1 Tank T5 PUL- 1 <br /> Sump Diameter/Dimensions: 48 in. 48 in. 25 by36 in. in. <br /> Sump Depth: 60.00 in. 60.00 in. 26.00 in. in. <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 18.00 12.00 0.00 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 17.00 15.00 12.00 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good good <br /> Portion of Sump Tested' 28 33 16 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both r* Yes r Nor NA t: Yes r No f NA ro Yes r Nor NA r Yes f Nor NA <br /> product and water)?* <br /> Turbine shutdown response time 02:00:00 sec 02:00:00 sec 02:00:00 sec sec <br /> Is system programmed for fail-safe (: Yes r Nor NA f: Yes r Nor NA 1* Yes r Nor NA r Yes r Nor NA <br /> shutdown?* <br /> Was fail-safe verified to be re Yes r No f NA C: Yes r Nor NA C: Yes r NorNA r Yes r Nor NA <br /> o erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min min <br /> test <br /> Test Start Time: 12:50:00 11:45:00 12:30:00 <br /> Initial Reading(RI): 0.00000 in. 0.00000 in. 0.00000 in. <br /> Test End Time: 13:20:00 12:15:00 13:00:00 <br /> Final Reading(RF): -0.00030 in. -0.00160 in. -0.00060 in. <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(RF-RI): -0.00030 in. -0.00160 in. -0.00060 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/-0.00200 +/-0.00200 <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? r Yes r No i^ NA C Yes r Nor NA Co Yes r Nor NA r Yes r Nor NA <br /> Was sensor properly replaced and t; Ycs t Nor NA r Yes r No r NA C Yes r Nor NA C Yes r Nor NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> HE <br /> IL so= mss• ..� ® - — <br /> lAN Y 1 2017 <br /> 1111\/I I"f/1h 111 A�( AITAI LJCNI TLJ <br /> If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of th stiI WMTwith an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. <br /> WO:2330376 <br />