Laserfiche WebLink
MONITORING AND REPORTING PROGRAM -3 - <br /> PAT <br /> 3 - <br /> PAT MITCHELL AND CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT AND DISPOSAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequencv Frequencv <br /> Kjeldahl-Nitrogen(as N) mg/l Grab Quarterly Quarterly <br /> Ammonia as Nitrogen mg/1 Grab Quarterly Quarterly <br /> Total Coliform Organisms MPN/100 ml Grab Quarterl� Quarterly <br /> TrihalomethanesI µg/1 Grab Annual Annua12 <br /> Analysis for this parameter shall be performed using EPA Method 8010 or equivalent. <br /> Z Annual samples shall be collected in the first quarter(January-March)sampling event. <br /> REPORTING <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the date, sample <br /> type (e.g., effluent, groundwater, etc.), and reported analytical result for each sample are readily <br /> discernible. The data shall be summarized in such a manner to clearly illustrate compliance with waste <br /> discharge requirements and spatial or temporal trends, as applicable. The results of any monitoring done <br /> more frequently than required by the Monitoring and Reporting Program, including wastewater data <br /> collected for industrial wastewater discharge permits, shall be reported in the next scheduled monitoring <br /> report. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> groundwater monitoring reports shall be prepared under the direct supervision of a California Registered <br /> Engineer or Geologist and signed by the registered professional. <br /> A. Monthly Monitoring Reports <br /> Monthly reports shall be submitted to the Regional Board on the 1"day of the second month following <br /> sampling (i.e. the January Report is due by 1 March). At a minimum, the reports shall include: <br /> 1. Results of effluent and flow monitoring. <br /> 2. Land application log book entries. <br /> 3. A comparison of monitoring data to the effluent limitations and an explanation of any violation of <br /> those requirements. Data shall be presented in tabular format. <br /> 4. If requested by staff, copies of laboratory analytical report(s). <br /> B. Quarterly Monitoring Reports <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such that <br /> samples are obtained approximately every three months. Quarterly monitoring reports shall be submitted <br /> to the Board by the 1" day of the second month after the quarter (i.e. the January-March quarter is due <br /> by May I") and may be combined with the monthly report. The Quarterly Report shall include the <br /> following: <br /> 1. A narrative description of all preparatory, monitoring, sampling, and analytical testing activities <br /> for the groundwater monitoring. The narrative shall be sufficiently detailed to verify compliance <br /> with the WDR, this MRP, and the Standard Provisions and Reporting Requirements. The <br />