My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0039799
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
0
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0039799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 5:39:49 PM
Creation date
8/8/2019 1:27:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0039799
PE
4372
STREET_NUMBER
0
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
APN
NEAR 04905001
ENTERED_DATE
7/11/2019 12:00:00 AM
SITE_LOCATION
0 LOCKEFORD ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R-1292 Geotechnical Boring <br /> Work Plan <br /> Task: Field Investigation <br /> The proposed field investigation includes a site reconnaissance to perform Pre-Dig Verification of the <br /> utility clearances including contracting a private utility locator and verifying utility clearance through <br /> USA, drilling, sampling and logging of exploratory borings, and staging of the drummed cuttings. A <br /> detailed description of our proposed field exploration program is presented as follows: <br /> • In accordance with PG&E Gas Contractor Safety requirements, a Pre-Dig Verification will be performed <br /> prior to excavation work.This will be attended by Kleinfelder staff, the private utility locator, the <br /> excavation subcontractor, and the PG&E Standby Inspector. We propose to perform the Pre-Dig <br /> Verification for all boring locations at the beginning of the drilling mobilization. If the Pre-Dig <br /> Verification process is required to be performed on a separate day in advance of the fieldwork, <br /> additional fees will apply. <br /> • Subsurface conditions will be explored by drilling two exploratory borings with a truck-mounted drill <br /> rig using hollow stem auger and mud rotary drilling methods to maximum depths of 80 feet below the <br /> ground surface. Drilling is constrained to what can be completed in two days in the field and one <br /> mobilization/demobilization of the drill crew. We expect the site will be accessible by truck-mounted <br /> drilling equipment. <br /> • The borings will be performed as close to practical as the proposed pipeline alignment.These locations <br /> will be adjusted as needed in the field due to site constraints or to avoid conflicts with underground <br /> utilities and/or overhead lines. <br /> • The borings will be hand augured in the upper 5 feet to clear the borings with regard to underground <br /> obstructions, per typical PG&E procedures. It is assumed that the boring locations will take no more <br /> than 30 minutes per boring to clear. <br /> • Soil samples will be obtained near the ground surface and at vertical intervals of approximately every 5 <br /> feet. Soils will be sampled using the hand auger in the upper five feet. Samples will be obtained for the <br /> remainder of the boring using either a 2-inch outside diameter, standard penetration test (SPT) barrel <br /> sampler in general accordance with ASTM D1586 or a 3-inch outside diameter, split-barrel "California- <br /> type" sampler in general accordance with ASTM D3550. The SPT and California-type samples will be <br /> obtained by driving a 140-pound automatic hammer with a free fall distance of 30 inches, in general <br /> accordance with ASTM D1586. Groundwater, if encountered, will be noted on the boring logs. <br />