Laserfiche WebLink
o Drilling fluid considerations <br /> o Solids and fluid volume guidelines <br /> o Borehole and fluidic drag coefficients for pipe pullback load estimating <br /> o Recommendations for control of inadvertent fluid releases and related contingency planning <br /> o Equipment support <br /> • Recommendations for Contractor selection and pre-bid services <br /> • Appendices including logs of borings and laboratory test results <br /> The final report will be provided as an electronic copy in PDF format. We will also provide the <br /> boring locations and/or report electronically in GIS format. <br /> Subcontractors: <br /> -Traffic Control: Road Safety Inc. <br /> -Drilling: Cascade Drilling <br /> -Engineering Services: Kleinfelder <br />