Laserfiche WebLink
Moiritoring System Certification <br />Site Address: 1399 N. MAIN ST. <br />Cad NORTHGATE <br />F. In -Tank Gauging / SIR Equipment <br />Date of Testing/Service: 10/24/2001 <br />0 Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No <br />Was accuracy of systern product level readings tested? <br />❑Yes <br />❑No <br />Was accuracy of system water level readings tested? <br />Yes <br />❑ No • <br />Were all probes reinstalled properly? <br />❑ Yes <br />I ❑ No <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />In the Section H, below, describe now and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑X Yes <br />E] No' <br />❑N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: X 3 h 0.1 h 0.2 h <br />❑ g.p. ❑ g.p. ❑ g.p. <br />X Yes <br />❑ No <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />X Yes <br />❑ No <br />Was the testing apparatus properly calibrated? <br />❑X Yes <br />❑ No <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑No • <br />❑X N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />1-1Yes❑No' <br />FX N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ Yes <br />❑No' <br />❑X N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ Yes <br />❑No • <br />0 N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />LJ Yes <br />❑No • <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />page 3 of 3 <br />