My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 3:46:44 AM
Creation date
8/8/2019 2:04:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form 1 <br /> Source Test Tesults <br /> Static Leak Test <br /> Date: 06/11/2002 Time: 10:30 Application No. <br /> GDF Name and address: 19976 1399 N.MAIN ST. <br /> Stage II system(check one): Vapor Balance [ ] Single Hose M.P.D. [ ] <br /> Vacuum Assist [X ] Type: VAPOR VAC <br /> Stage I type(check one): Two point [X ] Manifolded? Yes [X ] <br /> Coaxial [ ] No [ ] <br /> Tank# 1 2 3 <br /> Product grade RUL MUL PUL <br /> Actual tank capacity(gallons) 9995 9995 9995 29985 <br /> Gasoline volume (gallons) 2232 2437 2085 6754 <br /> Ullage(gallons) 7663 7558 7910 23131 <br /> Initial pressure of UST, inches H2O 0 <br /> Number of nozzles served by tank 4 4 4 12 <br /> Test location: (A) Stage I vapor <br /> coupler of(B) Stage II riser B B B B <br /> Initial Pressure, inches H2O (2.0) 2.00 <br /> Pressure after 1 min. (inches H2O) 2.00 <br /> Pressure after 2 min. (inches H2O) 1.99 <br /> Pressure after 3 min. (inches H2O) 1.98 <br /> Pressure after 4 min. (inches H2O) 1.98 <br /> Final Pressure after 5 min. (inches <br /> H2O) 1.98 <br /> Allowable Final Pressure: Table IA, <br /> Table 113, Equations 9.1, 9.2 1.96 <br /> Test Status [Pass or Fail] Pass <br /> Tests Conducted By: ACHAND <br /> Test Company: TANKNOLOGY Date of Tests: 06/11/2002 <br /> Tests Witnessed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.