Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - Pae I of 2) <br />TYPE OF ACTION ® 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ® I. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />49012 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) _ _ <br />I <br />BUSINESS NAME (Same as FACILITY NAME) 7 -Eleven #19976 <br />3. <br />BUSINESS SITE ADDRESS 1399 North Main Street 03_ CITY Manteca <br />104. <br />H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632 2634, 2638 2641 <br />MONITORING EQUIPMENT IS SERVICED 1. ANNUALLY 99.OTHERS ci <br />Q ® ❑ (Pe fY)� <br />490-3b <br />ago -3b <br />III. MONITORING LOCATIONS <br />1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 0 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)4904 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />PANEL MANUFACTURER: Veeder Root 490-7 <br />MODEL #: TLS350 <br />490-8 <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9. <br />MODEL #(S): 302 <br />490-10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-12. MODEL #: <br />490-13 <br />IN -TANK PROBE MANUFACTURER: 490-14, MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILYINIGHTLY ❑ c. WEEKLY <br />49°-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): - --�-- <br />490-17 <br />- <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />490-18 <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />4990-2z <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHERS if <br />TEST FRE Q (Specify): <br />490-2 <br />490-25 <br />C]99. OTHER (Specify): <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />® 1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />PANEL MANUFACTURER: Veeder Root 490-3° <br />MODEL #: TLS350 <br />490-31 <br />LEAK SENSOR MANUFACTURER: Veeder Root 412 <br />1 MODEL #(S): 208 <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ®a YES ❑ b. NO <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-35 <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED (23 CCR §2636) <br />490-36 <br />_ _ <br />MLLD MANUFACTURER(S): Vaporless (87) FE Petro (91) 490-37 MODEL #(S): LD2000 (87) STP -MLD (91) <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />ELLD MANUFACTURER(S) 490101 MODEL #(S): <br />490-41 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />49042 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />' 7_:l <br />49043 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES C1 b. NO <br />4)0-44 <br />4. PIPE INTEGRITY TESTING 49045 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHERS cif'_".. 9046490-47 <br />5. VISUAL PIPE MONITORING. '` <br />49048 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED- ; <br />490-49 <br />" Allowed for monitoring of unburied emer encu generator fuel piping only HSC 25281.5 6 3 '-- <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(a)(3)1. <br />490-50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />490-52 <br />490-53 <br />UPCF UST -D (12/2007) 1/4 <br />