My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
103
>
2900 - Site Mitigation Program
>
PR0523409
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
8/12/2019 1:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0523409
PE
2950
FACILITY_ID
FA0015819
FACILITY_NAME
FORMER CHEVRON
STREET_NUMBER
103
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95516
APN
23313023
CURRENT_STATUS
02
SITE_LOCATION
103 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Tammy Hodge CAMBRIA <br /> November 1, 1996 <br /> tank. All these tanks were steel. The July 1993 excavation was also used to remove five additional tanks. The <br /> available files do not contain any information regarding the size or nature of these five tanks. <br /> Over-Excavation During Tank Removal. The waste oil tank pit was over-excavated after it was removed. <br /> Since ground water was encountered during the excavation of the three known gasoline storage tanks and five <br /> unknown tanks, soil was only over-excavated an additional 1.5 feet(ft)in these tank pits. Additional details <br /> are documented later in this report. <br /> REPORT LIST <br /> The following investigation and other reports were included in the Chevron file and were reviewed as part of <br /> this site summary. Correspondence between Chevron and the regulatory agency and quarterly monitoring <br /> reports are not listed but were reviewed. <br /> Report List <br /> Date Consultant Report Title Work Performed <br /> 02/06/92 GeoStratcgics inc. Tank Removal Observation Removed the 550-gallon waste oil <br /> Report tank,collected soil samples from the <br /> tank pit and over-excavated the tank <br /> pit <br /> 01/07/93 Ground Water Environmental Assessment Drilled soil borings S13-1 through SB- <br /> Technology,Inc. Report 6,collected and analyzed soil samples <br /> and installed monitoring wells MW-1 <br /> through MW-3 <br /> 08/10/93 American Consulting Tank Removal-Soil Removed the three gasoline USTs and <br /> Remediation and Sampling Report the five additional tanks,sampled and <br /> Construction analyzed soil samples collected from <br /> the tank pit <br /> 09/08/93 Construction Materials Results of Compaction Soil Soil compaction tests on imported soil <br /> Testing, Inc. Testing placed in the tank excavation <br /> 04/26/95 Ground Water Environmental Assessment Drilled and installed monitoring wells <br /> Technology,Inc. Report MW-4 and MW-5,collected and <br /> analyzed soil samples <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.