Attachment 1 - Continuation Sheet SA No . <br /> Contractor W.O. No . <br /> Date <br /> 5.a . The Contractor shall remove, transport and dispose of the underground tank in <br /> accordance with all federal , state and local regulations applicable to this <br /> project. <br /> b. The Contractor shall coordinate all its work with the field representative, <br /> Jack Marquis at (209) 982-4416, Scott Hilyard at (916) 973-3340 and the <br /> project manager, Hassan Pejuhesh at (916) 322-8994. <br /> c. The Contractor shall notify the appropriate local agency at least 48 <br /> hours prior to initiating any work at this facility. <br /> d. The Contractor shall comply with all security and other pertinent <br /> regulations enforced at the facility. <br /> e. The Contractor shall obtain plans of the existing underground storage <br /> tank, if available, from the field representative and make open <br /> excavations as required to remove the underground storage tank. <br /> f. The Contractor shall verify all existing utility services in the <br /> immediate area prior to the work, and shall be responsible for any <br /> damages to these services. <br /> g. The Contractor shall sawcut, excavate , remove and dispose offsite the <br /> pavement and/or concrete situated above the underground tank prior to <br /> the excavation to remove the underground tank. This requirement may be <br /> waived by the project manager depending on the conditions of the <br /> existing surface. <br /> h. The Contractor shall provide a safety plan when the excavation is over five <br /> (5) feet, zero (0) inches deep. <br /> i . All work, including equipment, materials and installation shall conform <br /> to California Administrative Code, Title 24, Building Standards (CAC, <br /> Title 24) and to California Administrative Code, Title 8, Chapter 4, <br /> Division of Industrial Safety (DIS) . <br /> j . The Contractor shall backfill the tank cavity to 90 percent compaction. <br /> k. The Contractor shall replace or repair disturbed surfaces to match its <br /> original conditons . <br /> Subsidence of the disturbed surface shall be the responsibility of the <br /> Contractor and corrective lmeasures shall be made by the Contractor <br /> forthwith. <br /> 1 . Damage to existing facilities is the responsibility of the Contractor <br /> and corrective measures shall be taken to bring such facility back to <br /> its original condition. <br />