My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8010
>
2300 - Underground Storage Tank Program
>
PR0231717
>
REMOVAL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 7:41:17 PM
Creation date
8/15/2019 10:38:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1987
RECORD_ID
PR0231717
PE
2381
FACILITY_ID
FA0003816
FACILITY_NAME
OMS #24 STATE MILITARY DEPT*
STREET_NUMBER
8010
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
02
SITE_LOCATION
8010 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\8010\PR0231717\REMOVAL 1989.PDF
QuestysRecordID
96077
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\.. VOW <br /> Attachment 1 - Continuation Sheet SA No . 1 <br /> Contractor W.0.No. { <br /> Date ) <br /> m. The cost of performing Item No. 5 above shall not exceed $ <br /> 6. Contractor shall remove, transport and dispose of any product remaining <br /> in the tank at a cost not to exceed $ <br /> 7. The Contractor shall replace the removed concrete and/or pavement back to <br /> its original condition at a cost not to exceed $ <br /> i <br /> B. If b•required the .local <br /> q f jurisdiction, the Contractor shall take two soil � <br /> and/or groundwater samples , one from each end of the tank(s) , at <br /> elevation of three(3) feet directly below the bottom of the tank. <br /> a. The Contractor shall have all samples analyzed by a certified laboratory <br /> acceptable to the appropriate local jurisdiction and the Regional Water ` <br /> Quality Control Board for the total petroleum hydrocarbon , Benzene, <br /> Toluene, Xylene and total or3anic lead content. 4 <br /> b. Sampling , preservation and analysis shall be done in accordance with the <br /> requirements of the appropriate local jurisdiction and the Regional Water <br /> Quality Control Board. <br /> c. The cost of analysis of such samples is not included in this contract. <br /> 9. Total compensation shall not: exceed $ (dollars). E� <br /> 10. Lump sum payment shall be made upon completion of the work on the basis t <br /> of unit rates set forth in the contract proposal . j <br /> I <br /> i <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.