Laserfiche WebLink
\.. VOW <br /> Attachment 1 - Continuation Sheet SA No . 1 <br /> Contractor W.0.No. { <br /> Date ) <br /> m. The cost of performing Item No. 5 above shall not exceed $ <br /> 6. Contractor shall remove, transport and dispose of any product remaining <br /> in the tank at a cost not to exceed $ <br /> 7. The Contractor shall replace the removed concrete and/or pavement back to <br /> its original condition at a cost not to exceed $ <br /> i <br /> B. If b•required the .local <br /> q f jurisdiction, the Contractor shall take two soil � <br /> and/or groundwater samples , one from each end of the tank(s) , at <br /> elevation of three(3) feet directly below the bottom of the tank. <br /> a. The Contractor shall have all samples analyzed by a certified laboratory <br /> acceptable to the appropriate local jurisdiction and the Regional Water ` <br /> Quality Control Board for the total petroleum hydrocarbon , Benzene, <br /> Toluene, Xylene and total or3anic lead content. 4 <br /> b. Sampling , preservation and analysis shall be done in accordance with the <br /> requirements of the appropriate local jurisdiction and the Regional Water <br /> Quality Control Board. <br /> c. The cost of analysis of such samples is not included in this contract. <br /> 9. Total compensation shall not: exceed $ (dollars). E� <br /> 10. Lump sum payment shall be made upon completion of the work on the basis t <br /> of unit rates set forth in the contract proposal . j <br /> I <br /> i <br /> j <br />