Laserfiche WebLink
Standard Agreement - Continuation Sheet SA No. <br /> Contractor W.O. No. <br /> Date Page 2 of 3 <br /> 6. The Contractor shall provide the State with an approved copy of the tank <br /> removal application as submitted to the local jurisdiction. <br /> 7. The Contractor shall also provide the State with a receipt from the firm <br /> receiving the tank verifying that the tank has reached its destination <br /> in compliance with the tank removal application. <br /> 8. a. Contractor shall remove, transport and dispose of the underground tank <br /> in accordance with all federal, state and local regulations applicable <br /> to this project. <br /> b. The Contractor shall coordinate all its work with the field representative, <br /> Jack Marquis (209) 982-4416, and the Project Manager, Hassan Pejuhesh <br /> (916) 322-8994. <br /> c. Contractor shall notify the appropriate local agency at least 48 hours <br /> prior to initiating any work at this facility. <br /> d. The Contractor shall comply with all security and other pertinent <br /> regulations enforced at the facility. <br /> e. Contractor shall obtain plans of the existing underground storage tank <br /> if available from the field representative and make open excavations as <br /> required to remove the underground storage tank. <br /> f. Contractor shall verify all existing utility services in the immediate <br /> area prior to the work, and shall be responsible for any damages to these <br /> services. <br /> g. Contractor shall sawcut, excavate, remove, and dispose offsite the pavement <br /> and/or concrete situated above the underground tank prior to the excavation <br /> to remove the underground tank. This requirement may be waived by the <br /> project manager depending on the conditions of the existing surface. <br /> h. The Contractor shall provide a safety plan when the excavation is over <br /> 5 feet, 0 inches deep. <br /> i. All work, including equipment, materials and installation shall conform <br /> to California Administrative Code, Title 24, Building Standards <br /> (CAC Title 24) and to California Administrative Code, Title 8, Chapter 4, <br /> Division of Industrial Safety (DIS) . <br /> j. The Contractor shall backfill the tank cavity to 90 percent compaction. <br />