Laserfiche WebLink
C A M B R I A Mr. Jeffrey Wong <br /> March 30, 2005 <br /> Report Preparation: Following the receipt of analytical results from the laboratory, Cambria will <br /> prepare a written report, which will include field procedures, laboratory results, and conclusions. <br /> This report will document both the initial UST, dispenser, and product piping removal and the <br /> subsequent over-excavation activities. <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> professional geologist. <br /> Schedule <br /> Cambria proposes to conduct these over-excavation activities on April 1, 2005, with approval from <br /> SJCEHD. <br /> If you have any questions regarding the scope of work outlined in this work plan, please call <br /> Aubrey Cool at(510)420-3336. <br /> Sincerely, -S�pNAL GFO <br /> Cambria Environmental Technology, Inc. <br /> No. 7659 <br /> Aubrey K. Cool, P.G. <br /> Project Geologist d ' <br /> Figures 1 —Site Vicinity/Receptor Survey Map <br /> 2—Site Plan <br /> cc: Denis Brown, Shell Oil Products US, 20945 S. Wilmington Ave., Carson, CA 90810 <br /> James Barton, Regional Water Quality Control Board, 11020 Sun Center Drive, #200, <br /> Rancho Cordova, CA 95670 <br /> Jon Schultz, CB Richard Ellis, Inc., 555 Capitol Mall, Suite 100, Sacramento, CA 95814 <br /> Aaron Retts, CB Richard Ellis, Inc. (via email) <br /> GAStockton 4315 Waterloo Rd\WORK PLANS\Over-ex work plan 3-05\Work Plan-over-ex 3-05.doc <br /> 4 <br />