My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
3500 - Local Oversight Program
>
PR0545859
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 5:14:41 PM
Creation date
8/15/2019 11:31:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545859
PE
3528
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
02
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections, tank and line tests and tank field monitoring well tests. Purchaser further agrees to <br /> copy Equilon, within fifteen (15) days of the date request is made by Equilon. with any records <br /> pertaining to the above. Further, upon written request by Equilon, Purchaser shall make <br /> available all records required by applicable laws for review by Equilon at the Property during <br /> normal business hours. <br /> 4. CONSTRUCTION ON PROPERTY. Ownerfrenant shall provide Equilon with <br /> written notification at least thirty (30) days in advance of the date on which Owner/Tenant <br /> plan(s) to begin excavation at the Property for development ("Development"). Equilon shall be <br /> responsible for costs and expenses associated with the disposal of contaminated soil and <br /> disposal or treatment of contaminated groundwater caused by the UST System on the Property <br /> and encountered during the Development, in accordance with the following guidelines and <br /> requirements: <br /> 4.1 Ownerlrenant's written notification to Equilon shall state the dates during which <br /> the construction work will be performed and contain detailed work plans; <br /> 4.2 During the thirty (30) day period following the notice from OwnerfTenant, the <br /> Parties will coordinate and cooperate with each other in planning the simultaneous performance <br /> of the Development and activities Equilon's at the Property in such a manner as to minimize <br /> cost and time for each Party, including agreeing upon the scope and schedule of the removal <br /> activities and the schedule of the transporters and trucks needed for disposal. Owner/Tenant <br /> shall not commence excavation activities on the Property until the expiration of the thirty (30) <br /> day notice period; <br /> 4.3 Ownerfrenant shall:notify Equilon no later than forty-eight(48) hours in advance <br /> of excavation of any soils at the Property. For purposes of this sub-section, notification may be <br /> made by facsimile or electronic mail. Equilon will screen excavated soils for the presence of <br /> Substances using a Photo Ionization Detector ("PID'). Equilon will collect representative soil <br /> samples for analysis of Substances. Soil with Substances levels below the applicable State <br /> cleanup standard for commercialrndustrial property use will be considered "clean." Soil <br /> determined to be "clean"shall be used by Ownerfrenant for back-filling or other Development <br /> purpose at the Property. Ownerf Tenant shall, at its cost and expense, remove and properly <br /> dispose of any such clean soil if Ownerfrenant decide not to use such clean soil for back-filling <br /> or other Development purpose. Soil with levels of Substances above the applicable State <br /> cleanup standard for commerciaVindustrial property use will be considered "contaminated." <br /> OwnedTenant, under the direction of Equilon, shall segregate contaminated soil from dean soil. <br /> OwnerfTenant shall place, at its sole cost and expense, contaminated soil In trucks provided by <br /> Equilon. Equilon shall, at its sole cost and expense,transport and property dispose of any such <br /> contaminated soil at a permitted treatment, storage and disposal facility, or any other facility <br /> legally capable of accepting such soil. <br /> 4.4 OwnerlTenant shall notify Equilon no later than forty-eight (48) hours in advance <br /> of the removal of any liquids at the Property. For purposes of this sub-section, notification may <br /> be made by facsimile or electronic mail. Liquids with Substances levels below the applicable <br /> State cleanup standard for commercial industrial property use will be considered "clean." <br /> Ownerfrenant shall, at its cost and expense remove and properly dispose of any such clean <br /> liquids. Liquids with levels of Substances above the applicable State cleanup standard for <br /> commerciaUndustrial property use will be considered "contaminated." Owner/Tenant shall <br /> place, at its sole cost and expense, such contaminated liquids in trucks or tanks provided by <br />
The URL can be used to link to this page
Your browser does not support the video tag.