My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
3500 - Local Oversight Program
>
PR0545859
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 5:14:41 PM
Creation date
8/15/2019 11:31:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545859
PE
3528
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
02
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equilon. Equilon shall, at its sole cost and expense, transport and property dispose of any such <br /> contaminated liquids at a permitted treatment, storage and disposal facility, or any other facility <br /> legally capable of accepting such liquids. <br /> 4.5 Failure of Owner/Tenant to give Equilon notice of Development activities as <br /> required herein shall relieve Equilon from any responsibility or liability to Owner/Tenant for any <br /> costs, expenses or consequential damages that may result from Owner/Tenant undertaking <br /> such Development activities.For purposes of this section, all notifications shall be made to Tony <br /> Palagyi, 2555 13th Avenue, Sothwest, Seattle, Washington 98134, Phone: 425.377.8530, Fax: <br /> 425.377.1223, E-mail:aipalagyi@shellopus.com. <br /> 5. TERMINATION. Upon completion of its Corrective Action at the Property, this <br /> Agreement shall terminate and Equilon shall have no further obligation or responsibility to <br /> perform Corrective Action at the Property. Owner/Tenant agree(s) that Equilon will have <br /> completed its Corrective Action upon the earliest of(a)a determination by the Agency(i)that no <br /> further action is required by Equilon, or (ii) that the Corrective Action taken by Equilon at the <br /> Property has been completed; or (b) one year following the date Equilon submitted its written <br /> and supporting documentation to the Agency that Equilon considers its Corrective Action at the <br /> Property to be complete; or (c) one year following the date that the Agency directs Equilon to <br /> monitor only at the Property, regardless of whether Equilon has provided written notice (as <br /> provided in(a)above). <br /> 6. MUTUAL COOPERATION. Equilon agrees to coordinate its activities with <br /> Owner/Tenant to minimize any inconvenience to or interruption of the conduct of <br /> Owner/Tenant's business or development of the Property including, but not limited to, providing <br /> reasonable notice prior to all activities which Equilon believe may interrupt the conduct of <br /> Owner/Tenant's business. Owner/Tenant agree(s) to cooperate with Equilon, and execute any <br /> additional documents including,without limitation, permit applications,which may reasonably be <br /> requcred to effectuate the purpose of this Agreement. Owner/Tenant further agree(s) not to <br /> interfere with the activities conducted by Equilon on the Property. <br /> 7. PERMITS. Equilon,with the reasonable cooperation of Ownerfrenant, but at no <br /> expense to Owner/Tenant, shall obtain any and all permits which may be required for the <br /> Corrective Action it conducts pursuant to this Agreement <br /> 8. REPORTS. Equilon agrees to provide Owner/Tenant with copies of reports that <br /> are submitted to the Agency outlining the results of Equilon's Corrective Action performed <br /> pursuant to this Agreement. <br /> 9. SITE RESTORATION. Equilon agrees, upon completion of the Corrective Action <br /> contemplated by this Agreement, to restore the surface of the Property to as near the <br /> approximate grade and pavement as existed prior to said Corrective Action as is reasonably <br /> possible, including proper plugging, abandonment or removal of any monitoring well as may be <br /> 'squired in accordance with applicable law. Equilon shall not be responsible for the repair or <br /> replacement of underground utilities (except for public underground utilities damaged by <br /> 1=quilon) or other structures (including canopies)on the Property. <br /> 10. INDEMNITIES. Equilon agrees to indemnify, defend and hold Owner/Tenant <br /> (collectively referred to as "Indemnified Partyfiesp')harmless from any and all liabilities, losses, <br /> claims, demands, or orders arising out of the Corrective Action Equilon performs pursuant to <br />
The URL can be used to link to this page
Your browser does not support the video tag.