j 2.4.1 MONITORING WELL DESTRUCTION BY OVER-DRILLING <br /> Per .SJCEHD Well Standard requirements, wells located in an area of known or <br /> suspected contamination or that have laboratory data from the last sampling event that <br /> demonstrate the presence of any'contaminants of concern are to destroyed by removing <br /> all the contents of the well. Wells MW-1,MW-2,MW-5,MW-6, MW-8,and MW-10 meet <br /> these criteria. <br /> I <br /> For these wells, the well vaults will be removed, and the upper five feet of each location <br /> will be cleared for utilities using a vacuum truck assisted airknife. The wells will then be <br /> drilled out.to their original depths using the.same size auger originally used to install <br /> the well (Appendix A). The resulting boreholes :will be backfilled i:with neat cement <br /> grout through the augers from the bottom up to a depth of approximately one foot <br /> below grade (fbg). The upper one foot of the borehole will.be -filled_ with concrete or <br /> asphalt to match the surrounding grade. <br /> 2.4.2 MONITORING WELL DESTRUCTION BY PRESSURE GROUTING <br /> Per SJCEHD Well Standard requirements, wells that have laboratorydata from the last <br /> sampling event:that report non-detectable concentrations of contaminants of concern <br /> and with acceptable laboratory detection limits and are not in areas- of known of <br /> suspected soil.contamination, may be destroyed by pressure grouting from the bottom <br /> upward, while leaving the well in place. Wells MW-3, MW-4, MW-7, and MW-9 meet <br /> these criteria. <br /> i <br /> .. I <br /> For these wells, the well boxes will be removed, and the upper three feet of each well <br /> i <br /> location will be removed using a vacuum truck assisted airknife. Each resulting hole <br /> will be widened to approximately 22 inches in diameter (the original borehole diameter <br /> plus 12 inches) with the airknife, and the casing will be cut off to the depth of <br /> approximately 2.5 fbg. Cement grout will be added to the well casing from the bottom <br /> up using a tremie pipe until no additional grout will be accepted, and then 25 pounds <br /> per square inch of pressure will be applied to the casing for 5 minutes. The grout sealant <br /> will then be topped up and allowed lo spill out of the top of the well casing to forma <br /> mushroom cap seal with at least a 1 foot layer of neat cement grout.poured six inches <br /> above and six inches below the top of the cut-off casing. The upper 2 feet will be filled <br /> with concrete or asphalt to match the surrounding grade. <br /> I .r <br /> 241359(22) 2 CONESTOGA-ROVERS&ASSOCIATES <br /> l <br />