Laserfiche WebLink
Recommendations <br /> !action <br /> It is recommended that the Planning Commission: <br /> 1. Approve the Negative Declaration: and ; <br /> 2. Approve Use Permit Application No. UP-98-10 with the Findings and Conditions of Approval <br /> contained in the staff report. <br /> , <br /> Findings <br /> 1. The proposed use is consistent with the goals, policies, standards, and maps of the General Plan, <br /> any applicable Master Plan, Specific Plan, Special Purpose Plan, and any other applicable plan <br /> adopted by the County. <br /> • This finding can be made because intermediate general .industrial uses may be <br /> conditionally permitted in the I-W zone with an approved Use Permit application. <br /> 2. Adequate utilities; roadway improvements, sanitation, water supply, drainage, and other necessary <br /> facilities have been provided, and the proposed improvements are.properly related to existing and , <br /> proposed roadways. <br /> • This finding can be made because the provision of services are Conditions of Approval. <br /> 3. The site is physically suitable for the type of development and for the intensity P of development. <br /> • This finding can be made because the Plan demonstrates that all requirements of the <br /> zone can be met. <br /> 4. Issuance of the,permit will not be significantly detrimental to the public health, safety, or welfare or <br /> be injurious to the property or improvements of adjacent properties. <br /> • This finding can be made because the Initial Study prepared for this item did not identify <br /> any potentially significant public health and safety impacts. <br /> 5. The use is compatible with adjoining land uses. <br /> • This finding can be made because surrounding land uses are industrial and agricultural. <br /> All outside storage areas will be screened, as required by the General Plan. <br /> San Joaquin County IJP-98-1OlPombo <br /> Community Development Page 6 <br />