My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0522619
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2019 1:59:50 AM
Creation date
8/16/2019 11:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522619
PE
2950
FACILITY_ID
FA0015410
FACILITY_NAME
CHARLIE SPATAFORE PROPERTY
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
01
SITE_LOCATION
23577 MOUNTAIN HOUSE PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Improvement Plan for the buffer shall be reviewed and approved by CDD and MHCSD. <br /> 10. BBID Canal Conflicts: Fence off the on-site BBID canal (Canal 155)from proposed urban <br /> development until such time as the canal is filled.The fencing shall be sufficient to block access <br /> to the canal by all except BBID personnel and other authorized persons, and shall be <br /> developed in coordination with BBID to ensure that BBID has continued access to the canals <br /> for maintenance activities. <br /> Timing: Improvement plans approved by BBID, MHCSD, and CDD prior to Final Map approval. <br /> 11. Commercial/Industrial Design Guidelines and Special Purpose Plan_ All proposed <br /> commercial and industrial development shall comply with the applicable provisions of the <br /> Mountain House Business Park Design Guidelines and the Mountain House Business Park <br /> Special Purpose Plan. <br /> Timing: Include note on Final Map for all commercial and industrial lots requiring conformance <br /> with said design guidelines and Special Purpose Plan. Condition shall be met prior to issuance <br /> of building permits. <br /> 12. PLEP Requirement: The Tentative Map shall be subject to the provisions of the Public Land <br /> Equity Program ("PLEP").The Tentative Map as presented has a Public Land Deficit of 12.7 <br /> acres, as determined by CDD.[Note: CDD derived this number as follows:The amount of <br /> qualifying Public Land shown on the Tentative Map(including the Remainder Parcel)is 23.5 <br /> acres,whereas the amount of Public Land required by the PLEP is 36.2 acres(170.85 acres X <br /> 21.2%). The resulting Public Land Deficit is, therefore, 12.7 acres(36.2 acres minus 23.5 <br /> acres).]The developer(s)shall correct said Public Land Deficit by using one or more of the <br /> following methods: 1) Dedicating Public Land which is not shown on the Tentative Map but <br /> which is within the Mountain House Community to the Applicable Public Agency,sufficient in <br /> acreage to meet said Public Land Deficit; 2)transferring fee title ownership of Private Land <br /> which is not needed for public facilities or services but which is within the Mountain House <br /> Community to the MHCSD, sufficient in acreage to meet said Public Land Deficit; and/or 3) <br /> submitting land vouchers to the MHCSD, sufficient in acreage to meet said Public Land Deficit. <br /> [Mountain House Development Title, Chapter 9-1245M regarding the Public Land Equity <br /> Program, and Chapter 9-110M regarding definitions for"Public Land Deficit7,"Applicable Public <br /> Agency', "Private Land", and"land voucher".) If the PLEP,which includes the PLEP Technical <br /> Report, is revised prior to the approval of the first Final Map,the subdivider shall comply with <br /> the provisions of the revised PLEP. <br /> Timing: Condition shall be satisfied prior to approval of the first Final Map,or as required by the <br /> Applicable Public Agency. <br /> AGRICULTURAL RESOURCES <br /> 13. Provision of Irrigation Water. Before development,the project developer shall provide for the <br /> continued provision of irrigation water to downstream agriculture,which is reliant on the water <br /> from the irrigation canal traversing the project, by the installation of pipelines and other means. <br /> The filling of the irrigation canal shall be approved by BBID. <br /> Timing: Improvement plans approved by BBID, MHCSD,and CDD prior to Final Map approval. <br /> 14. Agricultural Buffer: To the extent feasible,the developer(s)shall provide or secure a setback <br /> from development to existing agricultural operations of at least 100 feet. [Master Plan Policies <br /> 3.2.4(g), (h),and(i); Specific Plan I Policy 4.2.2 (h).]An exception to the requirement for a <br /> setback may be granted when the owner of such agricultural land has indicated in writing that <br /> the land will no longer be used for agricultural production. <br /> Timing: Improvement plans approved by CDD and MHCSD prior to Final Map approval. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.