My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0522619
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2019 1:59:50 AM
Creation date
8/16/2019 11:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522619
PE
2950
FACILITY_ID
FA0015410
FACILITY_NAME
CHARLIE SPATAFORE PROPERTY
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
01
SITE_LOCATION
23577 MOUNTAIN HOUSE PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the coroner determines that the remains are those of a Native American, he or she shall <br /> contact the Native American Heritage Commission (NAHC)by phone within 24 hours of <br /> making that determination (HSC Section 7050[c]). Once a Most Likely Descendent(MLD)has <br /> been designated by the NAHC,the MLD, in consultation with the County, shall determine the <br /> ultimate disposition of the remains. The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human remains are outlined in detail in the <br /> PRC Section 5097.9. Measures likely resulting from the above could include preservation in <br /> place and capping/avoidance,or removal and continued monitoring of ground-disturbing <br /> activities. <br /> [I. MOUNTAIN HOUSE COMMUNITY SERVICE DISTRICT (Staff Contact: Gabriel <br /> Karam 468-9997) <br /> GENERAL <br /> 1. All subdivision improvements including but not limited to subdivision improvement plans, <br /> specifications, master utility plans and any subsequent discretionary and ministerial <br /> approvals shall be in conformance with Community Approvals, including but not limited to the <br /> Improvement Standards and Specifications of the Mountain House Community Services <br /> District(MHCSD), the Design Manual, Master Plan, Mountain House Business Park, master <br /> utility plans,and other standards and plans adopted by the MHCSD. These improvement <br /> plans and specifications must be approved by the MHCSD prior to approval of each phased <br /> Final or Parcel Map and prior to any subsequent discretionary and ministerial approvals shall <br /> be subject to Design Consistency review. The plan check fees shall be made with the <br /> submittal of the improvement plans and the field inspection services costs shall be made to <br /> the MHCSD prior to signing of the improvement plans. If the actual costs exceed the <br /> estimated costs,the developer shall pay the balance within 30 days upon receiving an <br /> Invoice from the MHCSD. Final Maps shall be recorded with the following note: <br /> "All subsequent discretionary and ministerial approvals within the boundaries of this <br /> subdivision map shall be subject to Design Consistency Review and shall be consistent <br /> with the conditions of approval adopted for the Tentative Map." <br /> 2. The developer shall comply with all requirements of State, Federal, Mountain House <br /> Business Park initial study, including but not limited to County, State and Federal <br /> requirements relative to air quality, storm water discharge, waste disposal and hazardous <br /> waste and the mitigation measures contained in the Initial Study for the Tentative Map. <br /> 3. Prior to any construction,appropriate plans,operating procedures and safeguards shall be <br /> undertaken to insure safety in the area of fuel lines and pipelines, consistent with the MHCSD <br /> Emergency Preparedness Plan (see Emergency Pipelines Safety Plan). <br /> 4. All onsite and offsite easements and dedications shown on and proposed for the Tentative <br /> Map shall be dedicated to the MHCSD or offer of dedication to the MHCSD shall be recorded <br /> on the Final or Parcel Map. Dedication of public rights-of-way shall be in conformance with <br /> the adopted Public Land Equity Program (PLEP). Any easements to be abandoned that <br /> belong to Byron Bethany Irrigation District(BBID)shall not be abandoned without prior <br /> approval of BBID. Timing: condition shall be met prior to approval of Final or Parcel Map. <br /> 5. Prior to or upon filing of the first Final or Parcel Map as determined by the MHCSD General <br /> Manager, all rights-of-ways necessary to provide utilities and two points of access to all areas <br /> of Mountain House Business Park as shown on the Tentative map shall be dedicated to the <br /> MHCSD or offer of dedication shall be made to the MHCSD. <br /> 6. All services performed by the MHCSD on any development project will be paid by the <br /> applicant at the full cost including overhead as determined by the MHCSD General Manager. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.