My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LILLIAN
>
403
>
2800 - Aboveground Petroleum Storage Program
>
PR0540801
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 9:29:22 AM
Creation date
8/20/2019 2:00:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540801
PE
2832
FACILITY_ID
FA0009058
FACILITY_NAME
VAN DE POL ENT INC FACILITY # 107
STREET_NUMBER
403
Direction
N
STREET_NAME
LILLIAN
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14337012
CURRENT_STATUS
01
SITE_LOCATION
403 N LILLIAN AVE
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i r <br /> RECEIVED <br /> 10 November 016 r ll ( ' ''' ° ;' ii 11�- �3t <br /> AGE Project No . 16-3876 F ri v i ro n ni n t a I <br /> Page 20 of 25 ENVIRONMENTAL HEALTH <br /> DEPART MENT <br /> General secor dary containment is provided in the event of overfills , as described in this <br /> SPCCP . Storage drums are not refilled , and therefore overfill prevention systems do not <br /> apply . <br /> 4 . 2 . 9 . Effluent Treatment Facilities - 40 CFR 112 . 8 ( c) ( 9) <br /> Due to the co tingencies provided for discharge control , the Facility has an exemption <br /> from filing a National Pollution Discharge Elimination System ( NPDES ) permit since no <br /> storm water is discharged to navigable waters . Additionally , grab stormwater samples are <br /> not collected . <br /> 4 . 2 . 10 . Visible Discharges - 40 CFR 112 . 8 (c) ( 10 ) <br /> Visible discharges from any container or appurtenance — including seams , gaskets , <br /> piping , pumps , valves , rivets , and bolts — are quickly corrected upon discovery . Oil is <br /> promptly removed from berm areas and disposed of according to the waste disposal <br /> method described in Section 5 . 0 . of this SPCCP . <br /> 4 . 2 . 11 . Mobile and Portable Containers - 40 CFR 112 . 8 ( c) ( 11 ) <br /> No mobile and portable container are stored on -site . The facility delivery trucks empty <br /> when leaving without inventory . <br /> 4 . 3 . TRANSFER OPERATIONS , PUMPING , AND IN - PLANT PROCESSES - 40 CFR <br /> 112 . 8 (1 <br /> ) <br /> Transfer operations at this facility is solely of oil from tanker trailers and bulk transport <br /> vehicles at respective LUAs . <br /> Transfer oper tions at this facility include the transfer of oil into or from tanker trailers at <br /> respective LUA, <br /> 4 . 3 . 1 . Transfer Lines Not in Service <br /> Lines that are not in service for an extended period of time are capped or blank-flanged <br /> and marked as to their origin . <br /> 4 . 3 . 2 . Transfer Lines on Standby <br /> Lines that are on standby for an extended period of time are capped or blank-flanged and <br /> marked as to their origin . <br />
The URL can be used to link to this page
Your browser does not support the video tag.