My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 2:38:17 PM
Creation date
8/21/2019 1:52:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...ted. <br /> SITE SPECIFIC CHARGES LISTED ON STATE WATER RESOURCES CONTROL BOARD BILL FOR THE <br /> TIME PERIOD OF JUNE 6, 1989 THROUGH JUNE 8, 1990 <br /> PAGE 2 <br /> 12/4 & 5/89 H. Knoll performed inspection for the purpose of monitoring <br /> i a well grouting of annular seal protection (well ordinance <br /> requirement) . <br /> 12/6/89 Ratliff inspected grouting and soil sampling activities. + <br /> 12/8/89 H. Knoll conducted grout inspection of monitoring well <br /> installation. <br /> 12./22/89* G. Lyon attempted to final monitoring well permit. No christy <br /> boxes. <br /> 12/26/89 Ratliff attempted to final monitoring well permit. <br /> 12/27/89 Ratliff spoke to consultant regarding permit final. <br /> 12/28/89 Received soils report while visiting site. No final <br /> inspection made. <br /> 12/29/89 Permit final inspection completed. <br /> 1/16/90 Discussion with Regional Water Quality Control Board (RWQCB) <br /> staff regarding work plan to excavate soil using auger <br /> equipment. <br /> ,. 1/24/90 Field inspections. Soil borings at pump islands. <br /> 1/26/90 Hand-augered soil borings at pump islands. Exploratory boring <br /> 36 feet. Grout inspections conducted for all borings. <br /> 2/28/90 Began review of PAR. Included in report: hazardous <br /> classification results; hand-auger/sampling; "versadrill" work <br /> plan; tank removal report. <br /> 3/1/90 Review of PAR completed. Comment letter prepared. <br /> 3/2/90* Received Status Report Update and work plan for overexcavat ion <br /> and vapor extraction system. <br /> 3/13/90 RWQCB consultation; discussion of PAR results and RWQCB <br /> comments of February 20, 1990. <br /> 3/21/90 Reviewed RWQCB comments received on Status Report Update and <br /> work plan. Correspondence prepared with related comments from <br /> review. <br /> 3/27/90* -Soil aeration log received. Reviewed document and filed. <br /> 4/3/90 Discussed PAR comments with consultant. <br /> 4/9/90 Prepared comment letter. .. <br /> 5/2/90* Proposition 65 notification prepared. Upgraded site to <br /> contract status #4; upgraded from soil to groundwater <br /> contamination. <br /> 5/4/90 Began preparation of Preliminary Assessment Summary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.