My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 2:38:17 PM
Creation date
8/21/2019 1:52:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 19, 1990 <br /> SOUR <br /> TIME PERIODI OF JUSITE SPECIFC NE 6LISTE THROUGH JUNE WATEB 81990 CES CONTROL BOARD BILL FOR THE <br /> er <br /> fors anpit mizedYe ccountingssof phis ob ll.John Mar hes itemiOzatoions 30,are 9 li ted ein <br /> chronological order and separated by site code number. <br /> SITE CODE 1081 - 1448 N. EL DORADO STREET; STOCKTON <br /> 10/17/89 Documents for entrance into Pilot program. Researched <br /> assessor's tax roll for other owners/responsible <br /> parties. Routine process. <br /> Reviewed submitted work plan for excavation. Inadequate <br /> submittal, discussed deficiencies with consultant over the <br /> telephone. <br /> 10/30/89 Hinson and Ratliff discussed and reviewed amended work plan. <br /> 10/31/89 Hinson and Ratliff visited site for perspective relative to <br /> the work plan proposal. Documented obvious odors dissipating <br /> from stockpiled soils and open excavation. <br /> 11/1/89 Follow up inspection report to joint inspection of 10/31/89 <br /> with Ratliff and Hinson. Large soil stockpiles from the UGT <br /> removal; causing nuisance to neighbors; possible vapors from <br /> soil. <br /> 11/3/89 Reviewed site with Supervisor due to extremely elevated levels <br /> of hydrocarbons in soil stockpiles. <br /> 11/6/89 Drafted letter to Wickland expressing concerns over possible <br /> hazardous benzene levels. <br /> 11/9/89 Ratliff met with consultant and Mr. Margowski to discuss <br /> site's complexities and possible solutions to problems. <br /> Drafted correspondence regarding joint inspection with Air <br /> Pollution Control District (APCD) ; pending permit to aerate <br /> soil. <br /> 11/10/89 Preparation of file documentation resulting from recent <br /> contacts by consultant and RP (responsible party) . <br /> 11/14/89 Ratliff reviewed tank removal report. Discussed complex soil <br /> contamination with Department of Health Services (DHS) staff. <br /> RP contacted DHS and requested clarification of Title 22 <br /> criteria for hazardous waste determination process. <br /> 11/28/89 Received acknowledgement letter by telefax; reviewed content <br /> and filed. <br /> 11/30/89 Site visit. Monitoring wells being drilled. Soil sampling <br /> taking place. <br /> 12/1/89 Ratliff performed inspection for the purpose of monitoring <br /> well grouting of annular seal protection (well ordinance <br /> requirement) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.