My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 2:38:17 PM
Creation date
8/21/2019 1:52:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK I <br /> Obtain City of Stockton Encroachment Permit, San Jaoquin County Health Drilling <br /> Perrmt and mark underiaTound utilities for dtillin activities. <br /> tih '4'M1fS;aSF.4s�y�';3.°.?v ... (N2 c:Y'yR'','-,'�ZF.S✓' ry .,.1.Y:�yc FK29..rF;I-WiVt�i+.a- fi. V+ Il <br /> Geologist, travel to and from site and mark site for 2.5 hr 70.00 175.00 <br /> underground utilities <br /> Mileage 120 mi 0.35 42.00 <br /> Geologist obtain Drilling permit from San Joaquin County 2 hr 70.00 140.00 <br /> Health 8c Ci of Stockton Encroachment Permit <br /> Project manager develop traffic safety plan for City of 2.5 75 187.5 <br /> Stockton and SJC permits <br /> *City of Stockton Encroachment Permit 1 128.00 128.0 <br /> * SJC Drilling permit fee 1 89.00 89.00 <br /> * WEGE 15% carrying charge for permits 15% 217.00 32.55 <br /> TOTAL TASK I $794.05 <br /> TASK.II <br /> Drill and sample two CPT test holes to 145 feet below the surface. Destroy test holes and <br /> resurface Douglas Road after completion of sampling. Collect water samples from A and <br /> B zone water. Analyze selected water samples using certified laboratory for <br /> concentrations of TPH-GBTEX, and MtBE. <br /> .'. " z�i.:. - ° , : s. :.. ....:s.�:".�.,... a�'a"�a;5"cw•.tiPitT3?::#�1V1"�iit)ST A-�'S13BTOTAL`.i£ <br /> Modify Site Health and safety Plan for offsite drilling 2 70.00 140.00 <br /> and sampling activities <br /> *CPT and water sampling rig,Travel time, Materials, 3 7540.00 7540.00 <br /> Construction and Cleanup hours for licensed drilling working inclusive <br /> contractor to drill, sample and destroy two CPT and two days <br /> h dro unch sample holes to 145 feet below surface. <br /> Certified laboratory analyze water samples for 6 120.00 720.00 <br /> concentrations of TPH-G, BTEX, 5 Oxygenates& Lead <br /> Scaven ers -Wickland has contract with Laboratory) <br /> * Rental of Traffic Safety cones and signs(20 delineators 25.00 3 75.00 <br /> and 3 signs) <br /> * WEGE 15%carrying charge for drilling services and 15% 7615.00 1142.25 <br /> traffic safe rental <br /> Geologist, supervise drilling operations conduct health 24 hr 70.00 1680.00 <br /> and safetv and collection of samples <br /> Portable GC-PID, screening samples for vertical/lateral 3 150.00 450.00 <br /> extent determination <br /> PID,air monitoring(health and safety) 3 50.00 150.00 <br /> Truck Mileage 360 mi 65 234.00 <br /> COC and sample preservation 1 50.00 50.00 <br /> TOTAL TASK 11 $12,181.25 <br /> I <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.