My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 2:38:17 PM
Creation date
8/21/2019 1:52:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HU L U iA <br /> CHRONOLOGY <br /> Page 2 <br /> Regal R.603 <br /> 6425 Pacific Ave, StIm •� <br /> October 26, 1994 <br /> Bio-venting source test on MW-8 for weekly two hour venting of well. <br /> March 6, 1996 <br /> Approval to modify SVE, remove the thermal oxidizing unit and replace abatement control with <br /> vapor phase activated carbon units <br /> June 5, 1997 <br /> Confirmation soil borings SB4,•SB5, SB6 and SB7. Installation of vapor extraction air sparging well <br /> MWI3 <br /> October 9, 1997 <br /> Approval to modify VES, remove carbon units from system vent directly to atmosphere, less than <br /> 2 pounds per day of Total Petroleum Hydrocarbons as gasoline (TPH-g) and below laboratory <br /> detection limits for Benzene. <br /> October 31, 1997 <br /> Completion of Lincoln Village plume study. <br /> December 8, 1997 } <br /> Start air sparging system in wells MW2 and MNV13. <br /> December 22, 1997 <br /> Oxygenants study found only MTBE in monitoring well MW i l at 30 µg/L. Natural attenuation <br /> study indicates that biodegradation is occurring. <br /> July 2, 1998 <br /> Total removal of TPH-g by soil vapor extraction and venting of MW8 was calculated as 75,088 <br /> pounds (12,014 gallons). <br /> December 1998 <br /> SVE operations discontinued. <br /> February 5, 1999 <br /> No fiatber action requested by BElI based upon removal of subsurface petroleum, shrinkage of <br /> the dissolved petroleum plume in groundwater and anticipated spatial stabilization of the residual I <br /> dissolved petroleum mass. <br /> February 23 thru March 6, 2000 <br /> Over-excavation at dispenser-island areas under approved work plan. 60 yards cubic <br /> yards removed and hauled to forward Landfill. Report of findings dated April 6, 2000 <br /> approved by PHS-EHD AND 'Request for NFA' approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.