Laserfiche WebLink
� • 1I <br /> _s. I <br /> i <br /> I � <br /> INTRODUCTION...................................................................................................................' ....2 <br /> WORKPLAN-LATERAL AND VERTICAL EXTENT OF GROUNDWATER r <br /> CONTAMINATIONEAST OF MW12..........................................................................................3 <br /> LOCATION....................................................................... .....................................................3 <br /> VERTICAL AND LATERAL EXTENT DOCUMENTATION SAMPLING PROCEDURES....3 <br /> SAMPLE POINT SITING DETERMINATION.................. ....................................................3 <br /> DRILLING AND SAMPLING METHODS AND PROCEDURES............ ...::........................4 <br /> SELECTION............................................................................................:: ...........................5 <br /> SB 2004 -UST FUND PREAPPROVAL ....................................................................................5 <br /> ENCROACHMENTAND PERMITS ........................................................................:................5 <br /> NOTIFICATIONS.......................................................................................................................6 <br /> EXCAVATED WELL MATERIALS AND FLUIDS..................................................................6 <br /> LIMITATIONS ..............................................................................................................................6 <br /> Figure l - Site Location <br /> Figure 2- Portion of USGS Topographic Map <br /> Figure 3 - Well Locations and proposed CPT test holes. <br /> I <br /> i <br /> i <br />