Laserfiche WebLink
.� INTRODUCTION 2 <br /> SITE LOCATION 2 <br /> REMEDIAL ACTION HISTORY 2 <br /> October 21, 1988 2 <br /> October 25, 1988 2 <br /> December 1-9, 1988 3 <br /> February 10, 1989 3 <br /> February 16, 1989 3 <br /> April 11, 1989 3 <br /> October 10—28, 1989 3 <br /> October 10, 1991 —March 5, 1996 3 <br /> March 6, 1996 3 <br /> June 5, 1997 4 <br /> July 31, 1997 4 <br /> Effectiveness of Vapor Extraction System on Impacted Soils and Groundwater 4 <br /> Siting of sample borings 4 <br /> Drilling Method/Well Construction 4 <br /> Documentation Sampling S <br /> Sample Results S <br /> Soil 6 <br /> • Water 6 <br /> Rinseate and Excavated Soil Handling 6 <br /> Update of Vapor Extraction System Operation 6 <br /> r <br /> Update of groundwater contaminant plume migration controls 7 <br /> Summary <br /> 7 <br /> Recommendations g <br /> Limitations 9 <br /> • <br /> 1 <br />