My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 5:03:23 PM
Creation date
8/21/2019 2:50:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006464
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK IV <br /> Report of Well Destruction/Site Restoration for closure. <br /> Geologist-document well destruction, site restoration 8 7000 560.00 <br /> rocedures <br /> Geologist complete and file DWR report for each destroyed 8 7000 56000 <br /> well <br /> Administrative, Finalize and print Report 2 4000 80 00 <br /> Reg Geologist, review and certify Report 2 11000 220.00 <br /> TOTAL TASK IV $1420.00 <br /> TOTAL TASKS I - IV $37,137.30 <br /> Surface Restoration <br /> Resurfacing of well destruction areas and environmental lateral areas will be performed <br /> after wells and laterals destructions have been completed on a time and materials basis <br /> A licensed asphalt/concrete contractor will perform this work Replacement of San <br /> Joaquin County sidewalk area (MW7) and possibly curb, hot patch asphalt parking lot <br /> areas MW6 and MW9 Compact backfill and hot patch environmental sewer lateral <br /> destruction area. Compact backfill and hotpatch momtor well traffic box removal areas <br /> MW1, MW2, MW2 valve, MW3, MW4, MW13 Compact backfill and hot patch asphalt <br /> vapor extraction condensate removal area west of MW10 at buildin <br /> URSA Engmeermg, Kevin Post (530) 241-5363 Time and See cost <br /> Pile Construction (916) 688-5954, too busy to Materials sheet URSA <br /> provide bid. Wickland pays URSA direct <br /> Project Geologist, site meetmg with contractor, 7 7500 $52500 <br /> pre surface restoration and inspection with <br /> contractor at completion of surface restoration <br /> Car mileage 250 035 $8750 <br /> Total not to exceed surface restoration $ <br /> Please include Western Geo-Engineers as well as Wickland Properties in any <br /> correspondence related to this request for pre approval <br /> Thank you for considering our request, <br /> Zrge onverse <br /> -Engineers <br /> Cc Mr John Margowsk4 Wickland Properties(916) 978-2485 <br /> Mr Marty Hartzell, CRWQCB-CVR(916) 255-3115 <br /> • Mr. Michael J Infurna Jr , San Joaqum County Health (209) 468-3454 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.