My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 5:03:23 PM
Creation date
8/21/2019 2:50:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006464
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Woodward drilling has been scheduled to perform the necessary well and lateral <br /> i destruction work, beginning on September 26, 2001. <br /> avt+trtsrV METAr <br /> Geologist mobilization(4 days) 8 7000 56000 <br /> * Woodward Drilling- Well destructions 4 23,816.00 23,816 00 <br /> working inclusive <br /> days <br /> * Rental of Traffic Safety cones and signs 5 75 37500 <br /> days <br /> * WEGE 15% carrying charge for drilling services and 15% 24,191 00 362865 <br /> traffic safety rental <br /> Geologist, supervise well destruction operations 40 hr 7000 280000 <br /> conduct health and safety and traffic safety <br /> PID, air monitoring(health and safety) 4 5000 200 00 <br /> Car Mileage 500 nu 35 17500 <br /> TOTAL TASK 11 $31,554.65 <br /> TASK III <br /> Site restoration, excavated soil and fluids removal <br /> ijilwi - i � susrnr �_ <br /> Laboratory analysis of excavated soil(TPHg, BTEX, 1 20000 20000 <br /> Pb), composite& digestion 20 tons <br /> Laboratory analysis of fluids generated during well 1 20000 20000 <br /> destruction(8260B &Cam 5 metals 200 gallons) <br /> Profile Packett for Forward Landfill, soil disposition 2 7000 14000 <br /> Manley& Sons load, transport &dispose of soil to 1 1300.00 130000 <br /> Forward Landfill (20 tons) <br /> pH meter 1 10 1000 <br /> LEL meter 1 50 5000 <br /> Water transfer pump with totaling meter 1 45 4500 <br /> Geologist supervises Manley & Sons soil removal, IOhr 7000 70000 <br /> discharge fluids to sewer, decommission sewer <br /> discharge system, decommission and clean treatment <br /> compound <br /> Truck Mileage 125 nu 65 8125 <br /> TOTAL TASK III $2,726.25 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.