My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006467
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 5:03:54 PM
Creation date
8/21/2019 2:53:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006467
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R603 UPDATE-10 11/09/92 <br /> 3. 2 VAPOR RECOVERY <br /> VAPOR RECOVERY SYSTEM AND MONITORING <br /> As stated in Update Status Report #5 , monitoring wells MW1, MW2, <br /> MW3 , MW10 and the excavation 6 inch (EX-411 ) have been individually <br /> manifolded to a vapor extraction system with individual valved <br /> orifices for flow control sampling and vacuum and flow <br /> measurements from the individual wells. MW2 and MW3 are <br /> manifolded together with 211 tubing T ' ed at the wells, but can be <br /> individually tested by placing a packer below the extraction T of <br /> the well to seal that well from the vacuum system. The individual <br /> wells are fitted with a PVC "T" head with an air tight cap for <br /> well access. The 'IT" lateral (211 ) is fitted with a 1/4" pipe to <br /> tubing fitting for obtaining vacuum/pressure and temperature <br /> readings. Wells MW2 , and EX-41' are fitted with a pipe to hose 2" <br /> fitting placed between the 'IT" and the 2" PVC flex hose that goes <br /> from the well to their individual condensation drop outs that hook <br /> into the extraction manifold. The 3" SCH 40 PVC lateral from MW3 <br /> is also fitted with a 2" pipe to hose fitting where it enters the <br /> traffic box near MW2 and is T' ed to the 2" tubing from MW2 at that <br /> • point. MW1 is fitted with a 2" PVC Y to allow access to the well <br /> from the straight leg of the Y and vapor recovery from the angled <br /> leg of the Y. The vacuum recovery piping from this point rises 7 <br /> feet into the air prior to an 90 degree elbow connecting 2" PVC <br /> pipe at a slight incline towards the eastern fence of the <br /> compound, 8 feet above the surface. At this point the PVC pipe <br /> drops into the condensation drop out tank for MW1, prior to the <br /> vacuum extraction manifold. MW10 is manifolded to the treatment <br /> compound via SCH 40 PVC pipe underground west towards the store. <br /> Once the pipe reaches the store it connects into a condensation <br /> drop out tank (Approximately 5 gallon capacity) prior to heading <br /> over the roof of the store with 2" galvanized pipe. The <br /> condensation tank is below ground in a concrete lined traffic box. <br /> The condensation collected in this tank is removed weekly via an <br /> air tight valve attached to the top of the air tight lid of the <br /> tank. Once the pipe reaches the roof of the store, it 90 degree <br /> elbows into SCH 40 W protected PVC pipe and heads across the roof <br /> towards the treatment compound. There it 90 degree elbows down <br /> the wall into a second condensation drop out tank prior to the <br /> manifold. At the manifold the individual wells , condensation tanks <br /> are connected to their own 2" PVC riser ( 36" in height) with an <br /> orifice plate and a gate valve at the top of the riser. <br /> Vacuum/pressure ports are located on either side of the orifice <br /> piaze. Each orifice kwell has iT-s own manome-cer kcalibra-ced in <br /> millimeters (mm) oil ) which are hooked to the ports for continuous <br /> • measurement of flow from a particular well , or in the case of MW2 <br /> and MW3, combination of wells. All the extraction wells are <br /> manifolded together above the gate valve to a 4 inch orifice riser <br /> PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.