My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006490
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:26:36 PM
Creation date
8/21/2019 2:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006490
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��`V 171v� :- 1386 EAST BEAME.R STREET <br /> WECy'E ESTERN WOODLAND, CA 95695-9603 <br /> GE4-ENGINEERS FAX (9 t 6) 662-0273 <br /> CALIF CONTRACTOR # 513857 A CORPORATION (916) 668-5300 <br /> REGISTERED GEOLOGISTS <br /> July 31 , 1991 <br /> Mr . Wilbur H. Smith TI <br /> Vice President <br /> SIMS-GRUPE MANAGEMENT CORP. INC <br /> 374 Lincoln Center <br /> Stockton, CA. 95207 <br /> ( 209 ) 478-9200 <br /> RE. Requested information concerning our site investigation and <br /> the ground water-soil vapor recovery/treatment system for former <br /> Regal Station 603 ( EXXON ) located at 6425 Pacific Avenue, <br /> Stockton, California. <br /> Dear Mr . Smith: <br /> I have enclosed the requested information; latest site report and <br /> the details of the vapor recovery-treatment system. Thank you for <br />. allowing us to reschedule PG&E for the installation of the gas <br /> line lateral to the store. Thisewill help expedite the final <br /> system construction, once we receive your permission. <br /> I hope to receive the information concerning your investigation as <br /> soon as possible, so an evaluation for the potential of the <br /> Lincoln Center plume encroaching into our recovery area can be <br /> made ; and What modifications may be needed. For your convenience, <br /> I have relisted the data needed: <br /> 1 . Location of wells, data regarding current concentration <br /> levels , and direction of ground water flow. <br /> 2 . Existing analytical results indicating VoC <br /> concentrations . <br /> 3 . Existing analytical results indicating Total Petroleum <br /> Hydrocarbon and BTEX concentrations . <br /> 4 . Boring logs and monitor well construction logs . <br /> 5 . Depths at which VOC's are found. <br /> 6 . Aquifer test results , if any . <br /> page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.