My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006538
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:49:54 PM
Creation date
8/21/2019 3:07:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006538
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology of remedial actions for Former Regal Station R603, 6425 Pacific Avenue, <br /> Stockton, California 95207 <br /> October 24, 1988 Ust's and dispensing piping removed, first discovery of gasoline <br /> tainted soil <br /> December 9, 1988 Workplan to drill and sample six exploratory borings and install 3 <br /> groundwater monitoring wells (MW I, MW2 and MW3) <br /> March 3, 1989 Installation of additional seven groundwater monitoring wells, <br /> delineation of groundwater plume (MW4, MW5, MW6, MW7, MW8, <br /> MW9, and MW 10) <br /> October 10, 1989 Installed pumps into MW I and MW3 for free product removal, <br /> recovered 40 gallons of gasoline and reduced thickness of product in <br /> wells from 1 26 feet at MW and 1 66 feet at MW3 to a sheen <br /> July 31, 1990 Submit Remedial Action Plan to San Joaquin County Health <br /> Januaiy 15, 1991 Vapor extraction source test <br /> January 23, 1991 Public comment period for Remedial Action Plan ends <br /> October 10, 1991 Start-up of vapor extraction system <br /> June 2, 1992 Sewer discharge permit approved for 1,200 gallons per day <br /> September 28, 1992 Completion of two downgradient wells (MW11, and MW12) <br /> December 1, 1992 Interim groundwater removal, purging selected wells (MWI, MW2, <br /> MW3, MW8 and MW10) twice a week until approval to install <br /> continuous pumping system is achieved <br /> August 30, 1993 Discontinue purging of selected wells after Lincoln Center voiced <br /> concerns that this activity could spread their PCE, TCE, DCE still <br /> undefined plume(s) <br /> 3 8603 Update #53/CLOSURE 2 10/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.