My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006538
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:49:54 PM
Creation date
8/21/2019 3:07:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006538
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 22, 1993 Vapor extraction system was turned off, due to concern of San Joaquin <br /> County field inspector the VES may be influencing Lincoln Village <br /> solvent plume <br /> December 30, 1993 Letter from San Joaquin County clarifying that the communications <br /> between the field inspector for the county and WEGE technician was <br /> misconstrued and at our earliest convenience, re-start the VES And in <br /> fact, the previous periodic groundwater extraction was controlling the <br /> migration of the plume and the VES was decreasing the amount of <br /> hydrocarbons available to leach into gtoundw Iter <br /> October 26, 1994 Bio-venting source test on MW-8 for weekly two hour venting of well <br /> March 6, 1996 Approval to modify VES, remove the thermal oxidizing unit and <br /> replace abatement control with vapor phase activated carbon units <br /> lune 5 1997 Confirmation soil borings S134, SBS, SB6 and SB7 Installation of <br /> vapor extraction air sparging well MWI3 <br /> Octobei 9, 1997 Approval to modify VES, remove carbon units from system vent <br /> directly to atmosphere, less than 2 pounds per day of Total Petroleum <br /> Hydrocarbons and below laboratory detection limits for Benzene <br /> October 31, 1997 Completion of Lincoln Village plume study <br /> December 8, 1997 Start air sparging system in wells MW2 and MW13 <br /> December 22, 1997 Oxygenants study found only MTBE in monitor well MWI 1 at 30 <br /> ug/L <br /> Natural attenuation study indicates that biodegradation is occurring <br /> July 2 1998 Total removal of TPHg by vapor extraction and venting of MW8 <br /> 75,088 pounds (12,014 gallons) <br /> September 8 1998 GROUNDWATER <br /> Primary MCL's have been achieved for monitor wells MWI, MW-3)' <br /> MW4, MW5, MW6, MW7, MW9, MWI0, MW11 and MWI3 <br /> Secondary MIC.L's have been acnievea for monitor welts M W i, M W 2, <br /> MW3, MW4, MW5, MW6, MW7, MW8, MW9, MW10, MW1I and <br /> MW12 <br /> SOIL <br /> Soil has been remediated <br /> u <br /> 4 R603 Update ##53/CLOSURE 2 10198 <br />
The URL can be used to link to this page
Your browser does not support the video tag.