My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006540
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:12:33 PM
Creation date
8/21/2019 3:08:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006540
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Effluent Sample <br /> A sample port for the effluent is located in the exhaust stack of <br /> the Remox system The flow pressure from the exhaust is great <br /> enough to fill a tedlar bag Sterile poly tubing is fitted to the <br /> exhaust port and the tedlar bag Then the sample valve of the <br /> tedlar bag is opened and the bag is filled with the sample . Once <br /> the tedlar bag is full, the valve is closed and locked, the sample <br /> port closed, and the appropriate label is placed on the bag <br /> The labels for both the influent and effluent tedlar bag samples <br /> show the date, time, sample ID# and analyses to be run <br /> Both the influent and effluent tedlar bag samples are then placed <br /> within a cooler, on ice, and are hand delivered to WEGE' s laboratory <br /> that same day <br /> The vapor sample is then infected into an FID (Flame Ionizing <br /> Detector) chromatograph and the resulting chromatogram compared to <br /> standard chromatograms of known TFH (Total Fuel Hydrocarbons, <br /> gasoline) and BTEX (benzene, toluene, ethlybenzene, and xylenes) <br /> concentrations A duel chromatograph comparison is also ran <br /> (Photovac 10550) to evaluate BTEX, TCE, PCE, and DCE <br /> . ON SITE ANALYSIS <br /> Besides bag samples collected for the WEGE laboratory some samples <br /> may be run on site using a Photovac 1OS50 PTD chromatograph. <br /> The influent and effluent samples are collected from the same ports <br /> as the bag samples but 60 cc syringes are used to collect the sample <br /> and 0 5 cc of the vapor sample are then infected directly into the <br /> PID chromatograph. The resulting chromatogram is then compared to <br /> a standard calibration run on the same chromatograph prior to the <br /> sample run <br /> During the initial month of operation, three effluent samples were <br /> obtained during the day and analyzed using the 1OS50 chromatograph <br /> The highest value is used to calculate the VOC poundage per day <br /> produced Presently, an influent and an effluent sample are <br /> obtained upon arrival to the site Adjustments are then made to the <br /> vapor extraction system removal of liquids from the condensation <br /> traps; closing the air dilute valve to maximize vapor removal, <br /> without causing the REMOX Unit to shut down due to high temperature <br /> shut off (greater than 15500F) , and closing the pump bypass to <br /> create maximum flow and vacuum from the wells . Once, these <br /> adjustments have been completed and the system has stabilized, <br /> influent and effluent samples are again obtained, along with samples <br /> from the individual extraction orifices (wells) The site is then <br /> secured until the next visit . <br /> r <br /> page 3 of R603 , 03/01/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.