My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006582
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:51:02 PM
Creation date
8/21/2019 3:15:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006582
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> dump treated ground water to the <br /> sewage system after well <br /> development and planned aquifer <br /> test . Initiate permitting for <br /> continuous sewer discharge of <br /> treated water from projected ground <br /> water pumping. <br /> March 24, 1989 City of Stockton request for <br /> information in regards to March 15, <br /> 1989 letter for sewer discharge . <br /> May 3, 1989 Letter from Mr. Wilbur H. Smith II, <br /> disapproving of Wickland' s plan to <br /> proceed with site remediation of <br /> the ground water, requesting <br /> information about the site <br /> assessment and proposed site <br /> mitigation. Information requested <br /> sent May 25, 1989 . <br /> October 10 , 1989 Installed free product removal <br /> pumps into MW1 and MW3 Reduced <br /> product thickness in MW1 from 1 26 <br /> feet to none detect by November 28 , <br /> 1989 and reduced product thickness <br /> in MW3 from 1 . 66 feet to none <br /> detect by October 28 , 1989 <br /> May 25, 1990 Performed slug test on all existing <br /> wells . Start draft of Final <br /> Remedial Plan for soil and ground <br /> water remediation. <br /> December 19, 1990 Notification by San Joaquin County <br /> Health that the draft Final <br /> Remedial Plan is open for public <br /> comment until January 23 , 1991 . <br /> January 15, 1991 Completion of vapor extraction <br /> source test . <br /> April 4 , 1991 Application for Authority to <br /> Construct vapor extraction/ground <br /> water treatment system. <br /> May 29, 1991 Notify Mr. Wilbur H Smith II of <br /> our plans to commence with <br /> construction of remediation system, <br /> asking permission to trench and <br /> bring natural gas into treatment <br /> compound <br /> July 22 , 1991 Mr. Wilbur H. Smith II requesting <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.